ROSTOV-3

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
VVER V-320
Joint Stock Company 'Concern Rosenergoatom'
Joint Stock Company 'Concern Rosenergoatom'
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
950 MWe
950 MWe
1000 MWe
3000 MWt
Construction Start Date First Criticality Date
15 Sep, 2009
07 Dec, 2014
First Grid Connection Commercial Operation Date
27 Dec, 2014
17 Sep, 2015

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
63.78 TW.h
86.2 %
87.8 %
13.8 %
88.5 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2014 16.280 1011 68
2015 5132.220 950 7040 100.0 99.6 99.6 104.6 104.6
2016 6110.000 950 6728 76.6 72.0 77.5 73.2 79.5
2017 6422.530 950 6888 78.6 76.4 77.0 77.2 78.5
2018 7709.570 950 7962 90.9 90.2 81.1 92.6 82.8
2019 7360.630 950 7848 89.6 87.5 82.6 88.4 84.2
2020 7651.880 950 8081 92.0 89.9 84.0 91.7 85.6
2021 7615.550 950 8010 91.4 90.2 85.0 91.5 86.5
2022 8018.570 950 8016 91.5 91.5 85.9 96.4 87.9
2023 7755.530 950 7783 88.8 88.7 86.2 93.2 88.5
Performance indicators are calculated from the Commercial Operation Date.