ROSTOV-2

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
VVER V-320
Joint Stock Company 'Concern Rosenergoatom'
Joint Stock Company 'Concern Rosenergoatom'
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
950 MWe
950 MWe
1000 MWe
3200 MWt
Construction Start Date First Criticality Date
01 May, 1983
22 Jan, 2010
First Grid Connection Commercial Operation Date
18 Mar, 2010
10 Dec, 2010

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
105.28 TW.h
89.9 %
90.4 %
10.1 %
93.3 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2010 4303.760 950 6133 100.0 100.0 100.0 97.9 97.9
2011 7368.430 950 7944 90.7 89.4 90.2 88.6 89.3
2012 7433.180 950 7781 88.6 87.6 89.0 89.1 89.2
2013 7832.670 950 8151 93.0 92.8 90.2 94.1 90.8
2014 7741.450 950 8018 91.5 91.2 90.5 93.0 91.3
2015 7525.830 950 7610 86.9 86.4 89.7 90.4 91.2
2016 7890.030 950 7974 90.8 90.2 89.7 94.6 91.7
2017 7734.150 950 7755 88.5 88.3 89.5 92.9 91.9
2018 6666.680 950 6845 78.1 76.8 88.0 80.1 90.4
2019 8662.060 950 8650 98.7 98.7 89.1 104.1 91.9
2020 7864.150 950 7982 90.9 90.6 89.3 94.2 92.2
2021 7418.560 950 7532 86.0 85.1 88.9 89.1 91.9
2022 8865.360 950 8760 100.0 100.0 89.8 106.5 93.1
2023 7978.300 950 7985 91.2 90.6 89.9 95.9 93.3
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2025-02-15


Previous  (ROSTOV-1) (ROSTOV-3)  Next