ATUCHA-2

Operational


Reactor Details

Reactor Type Model Owner Operator
PHWR
PHWR KWU
NUCLEOELECTRICA ARGENTINA S.A.
NUCLEOELECTRICA ARGENTINA S.A.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
693 MWe
692 MWe
745 MWe
2160 MWt
Construction Start Date First Criticality Date
13 Jul, 1981
03 Jun, 2014
First Grid Connection Commercial Operation Date
27 Jun, 2014
26 May, 2016

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
28.24 TW.h
45.8 %
64.5 %
54.2 %
45.6 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2014 1093.350 692 3071
2015 3925.920 692 6928
2016 5200.540 692 8063 89.5 84.6 84.6 83.8 83.8
2017 3356.610 693 5130 58.6 56.3 66.8 55.3 65.8
2018 4178.880 693 6448 73.6 68.8 67.6 68.8 67.0
2019 1748.390 693 7001 79.9 28.8 56.8 28.8 56.3
2020 2421.870 693 6155 70.1 39.8 53.0 39.8 52.7
2021 3510.880 693 7217 82.4 57.8 53.9 57.8 53.6
2022 1259.030 693 3381 38.6 20.7 48.9 20.7 48.6
2023 1541.930 693 2958 33.8 25.4 45.8 25.4 45.6
Performance indicators are calculated from the Commercial Operation Date.