BELOYARSK-4
Operational
Reactor Details
Reactor Type
Model
Owner
Operator
FBR
BN-800
Joint Stock Company 'Concern Rosenergoatom'
Joint Stock Company 'Concern Rosenergoatom'
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
820
MW
e
820
MW
e
885
MW
e
2100
MW
t
Construction Start Date
First Criticality Date
18 Jul, 2006
27 Jun, 2014
First Grid Connection
Commercial Operation Date
10 Dec, 2015
31 Oct, 2016
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
8.66 TW.h
73.3 %
77.9 %
26.7 %
73.4 %
Lifetime performance calculated up to year
2017
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
2015
34.550
789
23
2016
3456.960
820
5453
96.4
81.9
81.9
82.0
82.0
2017
5165.750
820
6551
74.8
71.8
73.3
71.9
73.4
Performance indicators are calculated from the Commercial Operation Date.
Above data are from the PRIS database. Last update on 2018-11-19
Previous
(BELOYARSK-3)
(BILIBINO-1)
Next
RUSSIA
AKADEMIK LOMONOSOV-1
AKADEMIK LOMONOSOV-2
APS-1 OBNINSK
BALAKOVO-1
BALAKOVO-2
BALAKOVO-3
BALAKOVO-4
BALTIC-1
BELOYARSK-1
BELOYARSK-2
BELOYARSK-3
BELOYARSK-4
BILIBINO-1
BILIBINO-2
BILIBINO-3
BILIBINO-4
KALININ-1
KALININ-2
KALININ-3
KALININ-4
KOLA-1
KOLA-2
KOLA-3
KOLA-4
KURSK 2-1
KURSK-1
KURSK-2
KURSK-3
KURSK-4
LENINGRAD 2-1
LENINGRAD 2-2
LENINGRAD-1
LENINGRAD-2
LENINGRAD-3
LENINGRAD-4
NOVOVORONEZH 2-1
NOVOVORONEZH 2-2
NOVOVORONEZH-1
NOVOVORONEZH-2
NOVOVORONEZH-3
NOVOVORONEZH-4
NOVOVORONEZH-5
ROSTOV-1
ROSTOV-2
ROSTOV-3
ROSTOV-4
SMOLENSK-1
SMOLENSK-2
SMOLENSK-3