BELOYARSK-4

Operational


Reactor Details

Reactor Type Model Owner Operator
FBR
BN-800
Joint Stock Company 'Concern Rosenergoatom'
Joint Stock Company 'Concern Rosenergoatom'
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
820 MWe
820 MWe
885 MWe
2100 MWt
Construction Start Date First Criticality Date
18 Jul, 2006
27 Jun, 2014
First Grid Connection Commercial Operation Date
10 Dec, 2015
31 Oct, 2016

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
37.11 TW.h
67.1 %
71.1 %
32.9 %
67.2 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2015 34.550 820 23
2016 3456.960 820 5453 96.4 81.9 81.9 82.0 82.0
2017 5165.750 820 6551 74.8 71.8 73.3 71.9 73.4
2018 4408.980 820 5680 64.8 61.2 67.7 61.4 67.8
2019 4909.250 820 6196 70.7 68.3 67.9 68.3 68.0
2020 5934.140 820 7373 83.9 81.9 71.3 82.4 71.4
2021 3087.270 820 4049 46.2 43.3 65.9 43.0 65.9
2022 5174.470 820 6710 76.6 71.6 66.8 72.0 66.9
2023 4937.400 820 6697 76.4 68.7 67.1 68.7 67.2
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-09-10