NOVOVORONEZH-4
Operational
Reactor Details
Reactor Type
Model
Owner
Operator
PWR
VVER V-179
Joint Stock Company 'Concern Rosenergoatom'
Joint Stock Company 'Concern Rosenergoatom'
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
385
MW
e
385
MW
e
417
MW
e
1375
MW
t
Construction Start Date
First Criticality Date
01 Jul, 1967
25 Dec, 1972
First Grid Connection
Commercial Operation Date
28 Dec, 1972
24 Mar, 1973
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
134.40 TW.h
78.2 %
82.7 %
21.8 %
78.1 %
Lifetime performance calculated up to year
2023
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
1972
4.000
385
88
1973
2570.510
385
8072
93.2
84.2
84.2
85.0
85.0
1974
2411.840
385
7159
81.7
71.3
76.8
71.5
77.3
1975
2644.870
385
7950
90.8
75.6
76.4
78.4
77.7
1976
2924.130
385
7963
90.6
84.5
78.6
86.5
80.0
1977
2822.950
385
7637
87.2
81.3
79.1
83.7
80.8
1978
2658.540
385
7388
84.3
78.2
79.0
78.8
80.5
1979
2442.240
385
6888
78.6
72.4
78.0
72.4
79.3
1980
2842.930
385
7690
87.6
84.1
78.8
84.1
79.9
1981
3019.870
385
8278
94.5
90.0
80.1
89.6
81.0
1982
2797.510
385
8278
94.5
83.9
80.5
83.0
81.2
1983
2950.300
385
8216
93.8
89.2
81.3
87.5
81.8
1984
2974.100
385
7982
90.9
87.9
81.8
87.9
82.3
1985
3097.870
385
8250
94.2
91.3
82.6
91.8
83.0
1986
2792.210
385
7688
87.8
82.6
82.6
82.8
83.0
1987
3262.680
417
8252
94.2
91.7
83.2
89.3
83.5
1988
2529.370
385
7152
81.4
80.0
83.0
74.8
82.9
1989
2710.260
385
8357
95.4
90.2
83.5
80.4
82.8
1990
2244.690
385
6622
75.6
69.6
82.7
66.6
81.9
1991
1827.620
385
5540
63.2
58.0
81.4
54.2
80.4
1992
2853.440
385
8163
92.9
82.4
81.4
84.4
80.6
1993
2613.710
385
7204
82.2
76.6
81.2
77.5
80.5
1994
1954.270
385
6033
68.9
56.6
80.1
58.0
79.4
1995
2119.990
385
5818
66.4
62.2
79.3
62.9
78.7
1996
3080.280
385
8362
95.2
90.4
79.8
91.1
79.2
1997
2235.480
385
6690
76.4
67.0
79.2
66.3
78.7
1998
2714.870
385
7366
84.1
80.2
79.3
80.5
78.8
1999
1791.480
385
4927
56.2
53.2
78.3
53.1
77.8
2000
2474.250
385
6784
77.2
73.1
78.1
73.2
77.6
2001
2655.950
385
7173
81.9
79.2
78.2
78.8
77.7
2002
2184.850
385
5857
66.9
64.2
77.7
64.8
77.3
2003
2583.050
385
6950
79.3
76.8
77.7
76.6
77.2
2004
2714.010
385
7685
87.5
80.8
77.8
80.2
77.3
2005
2433.380
385
7228
82.5
73.1
77.6
72.2
77.2
2006
2575.080
385
7636
87.2
76.5
77.6
76.4
77.2
2007
2290.270
385
6488
74.1
67.9
77.3
67.9
76.9
2008
2876.300
385
7464
85.0
83.4
77.5
85.0
77.1
2009
2931.780
385
7580
86.5
85.2
77.7
86.9
77.4
2010
2928.700
385
7727
88.2
85.8
77.9
86.8
77.6
2011
2707.550
385
7263
82.9
80.6
78.0
80.3
77.7
2012
2944.860
385
7707
87.7
87.1
78.2
87.1
77.9
2013
3038.980
385
7929
90.5
89.4
78.5
90.1
78.2
2014
3061.070
385
7932
90.5
89.3
78.7
90.8
78.5
2015
2704.380
385
7085
80.9
79.6
78.8
80.2
78.6
2016
2959.490
385
7783
88.6
87.3
78.9
87.5
78.8
2017
3148.860
385
8259
94.3
92.5
79.2
93.4
79.1
2018
8.920
385
73
0.8
0.4
77.5
0.3
77.4
2019
2994.940
385
7654
87.4
86.2
77.7
88.8
77.6
2020
2945.240
385
7956
90.6
89.3
78.0
87.1
77.8
2021
3020.990
385
7951
90.8
89.7
78.2
89.6
78.1
2022
2199.850
385
5716
65.2
64.4
77.9
65.2
77.8
2023
3055.960
385
8001
91.3
90.2
78.2
90.6
78.1
Performance indicators are calculated from the Commercial Operation Date.
Above data generated by the PRIS database. Last update on 2024-10-03
Previous
(NOVOVORONEZH-3)
(NOVOVORONEZH-5)
Next
RUSSIA
AKADEMIK LOMONOSOV-1
AKADEMIK LOMONOSOV-2
APS-1 OBNINSK
BALAKOVO-1
BALAKOVO-2
BALAKOVO-3
BALAKOVO-4
BELOYARSK-1
BELOYARSK-2
BELOYARSK-3
BELOYARSK-4
BILIBINO-1
BILIBINO-2
BILIBINO-3
BILIBINO-4
BREST-OD-300
KALININ-1
KALININ-2
KALININ-3
KALININ-4
KOLA-1
KOLA-2
KOLA-3
KOLA-4
KURSK 2-1
KURSK 2-2
KURSK-1
KURSK-2
KURSK-3
KURSK-4
LENINGRAD 2-1
LENINGRAD 2-2
LENINGRAD 2-3
LENINGRAD-1
LENINGRAD-2
LENINGRAD-3
LENINGRAD-4
NOVOVORONEZH 2-1
NOVOVORONEZH 2-2
NOVOVORONEZH-1
NOVOVORONEZH-2
NOVOVORONEZH-3
NOVOVORONEZH-4
NOVOVORONEZH-5
ROSTOV-1
ROSTOV-2
ROSTOV-3
ROSTOV-4
SMOLENSK-1
SMOLENSK-2
SMOLENSK-3