APS-1 OBNINSK (Atomic Power Station 1 Obninsk)
Permanent Shutdown
Reactor Details
Reactor Type
|
Model
|
Owner
|
Operator
|
LWGR
|
AM-1
|
MINISTRY OF MEDIUM MACHINE BUILDING OF THE USSR (MINSREDMASH)
|
MINISTRY OF MEDIUM MACHINE BUILDING OF THE USSR (MINSREDMASH)
|
Reference Unit Power (Net Capacity)
|
Design Net Capacity
|
Gross Capacity
|
Thermal Capacity
|
5
MWe
|
5
MWe
|
6
MWe
|
30
MWt
|
Construction Start Date
|
First Criticality Date
|
|
|
01 Jan, 1951
|
06 May, 1954
|
|
|
First Grid Connection
|
Commercial Operation Date
|
|
|
27 Jun, 1954
|
01 Dec, 1954
|
|
|
Permanent Shutdown Date
|
29 Apr, 2002
|
LifeTime Performance
Electricity Supplied
|
Energy Availability Factor
|
Operation Factor
|
Energy Unavailability Factor
|
Load Factor
|
NC
|
NC
|
NC
|
NC
|
NC
|
Lifetime performance calculated up to year
2002
Operating History
Year
|
Electricity Supplied
[GW.h]
|
Reference Unit Power
[MW]
|
Annual Time On Line
[h]
|
Operation Factor
[%]
|
Energy Availability Factor
[%]
|
Load Factor
[%]
|
Annual
|
Cumulative
|
Annual
|
Cumulative
|
1954
|
Data Not Provided
|
1955
|
"
|
1956
|
"
|
1957
|
"
|
1958
|
"
|
1959
|
"
|
1960
|
"
|
1961
|
"
|
1962
|
"
|
1963
|
"
|
1964
|
"
|
1965
|
"
|
1966
|
"
|
1967
|
"
|
1968
|
"
|
1969
|
"
|
1970
|
"
|
1971
|
"
|
1972
|
"
|
1973
|
"
|
1974
|
"
|
1975
|
"
|
1976
|
"
|
1977
|
"
|
1978
|
"
|
1979
|
"
|
1980
|
"
|
1981
|
"
|
1982
|
"
|
1983
|
"
|
1984
|
"
|
1985
|
"
|
1986
|
"
|
1987
|
"
|
1988
|
"
|
1989
|
"
|
1990
|
"
|
1991
|
"
|
1992
|
"
|
1993
|
"
|
1994
|
"
|
1995
|
"
|
1996
|
"
|
1997
|
"
|
1998
|
"
|
1999
|
"
|
2000
|
"
|
2001
|
"
|
2002
|
"
|
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS
Above data generated by the PRIS database. Last update on 2023-10-02