DARLINGTON-2

Operational


Reactor Details

Reactor Type Model Owner Operator
PHWR
CANDU 850
Ontario Power Generation
Ontario Power Generation
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
878 MWe
881 MWe
934 MWe
2776 MWt
Construction Start Date First Criticality Date
01 Sep, 1981
05 Nov, 1989
First Grid Connection Commercial Operation Date
15 Jan, 1990
09 Oct, 1990

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
185.93 TW.h
72.1 %
75.6 %
27.9 %
71.9 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1990 1153.470 881 1608 80.7 64.9 64.9 65.7 65.7
1991 51.480 881 102 1.2 0.7 12.6 0.7 12.7
1992 1290.160 881 2418 27.5 16.7 14.4 16.7 14.5
1993 6370.160 881 7594 86.7 82.7 35.6 82.5 35.6
1994 6750.760 881 8069 92.1 88.5 48.1 87.5 47.8
1995 6952.960 881 8104 92.5 90.6 56.2 90.1 55.9
1996 6705.750 881 7752 88.2 87.2 61.2 86.6 60.9
1997 4710.390 881 7069 80.7 61.5 61.3 61.0 60.9
1998 6227.930 881 7492 85.5 80.7 63.6 80.7 63.3
1999 6469.080 881 7824 89.3 83.8 65.8 83.8 65.5
2000 6885.420 881 8221 93.6 89.0 68.1 89.0 67.8
2001 5826.450 881 7030 80.2 75.5 68.7 75.5 68.5
2002 7268.930 881 8627 98.5 94.2 70.8 94.2 70.6
2003 6084.100 881 7245 82.7 79.3 71.5 78.8 71.2
2004 7038.380 881 8737 99.5 91.4 72.9 91.0 72.6
2005 6056.210 878 7031 80.3 78.9 73.3 78.7 73.0
2006 7548.390 878 8745 99.8 98.6 74.8 98.1 74.6
2007 6364.830 878 7327 83.6 82.8 75.3 82.8 75.0
2008 7560.940 878 8696 99.0 98.2 76.5 98.0 76.3
2009 6745.270 878 7769 88.7 87.7 77.1 87.7 76.9
2010 6234.300 878 7248 82.7 81.1 77.3 81.1 77.1
2011 7503.510 878 8719 99.5 97.7 78.3 97.6 78.0
2012 7157.950 878 8467 96.4 93.0 78.9 92.8 78.7
2013 5138.760 878 6131 70.0 67.0 78.4 66.8 78.2
2014 7412.530 878 8522 97.3 96.4 79.2 96.4 79.0
2015 6405.950 878 7428 84.8 83.4 79.3 83.3 79.1
2016 5728.840 878 6793 77.3 74.4 79.1 74.3 78.9
2017 0.000 878 0 0.0 0.0 76.2 0.0 76.0
2018 0.000 878 0 0.0 0.0 73.5 0.0 73.4
2019 0.000 878 0 0.0 0.0 71.0 0.0 70.8
2020 4218.910 878 5144 58.6 54.7 70.5 54.7 70.3
2021 7158.020 878 8568 97.8 93.5 71.2 93.1 71.0
2022 5985.000 878 7018 80.1 78.1 71.4 77.8 71.2
2023 7240.390 878 8621 98.4 94.4 72.1 94.1 71.9
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-09-18