CHASNUPP-2
(Chashma Nuclear Power Plant Unit 2)
Operational
Reactor Details
Reactor Type
Model
Owner
Operator
PWR
CNP-300
PAKISTAN ATOMIC ENERGY COMMISSION
PAKISTAN ATOMIC ENERGY COMMISSION
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
300
MW
e
300
MW
e
325
MW
e
999
MW
t
Construction Start Date
First Criticality Date
28 Dec, 2005
22 Feb, 2011
First Grid Connection
Commercial Operation Date
14 Mar, 2011
18 May, 2011
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
26.67 TW.h
86.9 %
88.3 %
13.1 %
87.2 %
Lifetime performance calculated up to year
2023
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
2011
1570.980
300
5766
86.9
88.2
88.2
85.3
85.3
2012
2215.760
300
7864
89.5
83.7
85.4
84.1
84.5
2013
1700.820
300
6308
72.0
64.7
77.4
64.7
76.9
2014
2190.360
300
7546
86.1
83.9
79.2
83.4
78.7
2015
2361.480
300
7855
89.7
89.2
81.4
89.9
81.1
2016
2335.430
300
7718
87.9
88.2
82.6
88.6
82.5
2017
2584.570
300
8520
97.3
97.6
84.9
98.4
84.9
2018
2296.390
300
7679
87.7
88.2
85.3
87.4
85.2
2019
2263.060
300
7573
86.4
86.4
85.4
86.1
85.3
2020
2167.470
300
7379
84.0
81.3
85.0
82.2
85.0
2021
2602.180
300
8493
97.0
98.2
86.2
99.0
86.3
2022
2384.880
300
7902
90.2
89.9
86.6
90.8
86.7
2023
2461.130
300
8144
93.0
90.3
86.9
93.6
87.2
Performance indicators are calculated from the Commercial Operation Date.
Above data generated by the PRIS database. Last update on 2024-09-18