CHASNUPP-1 (Chashma Nuclear Power Plant Unit 1)

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
CNP-300
PAKISTAN ATOMIC ENERGY COMMISSION
PAKISTAN ATOMIC ENERGY COMMISSION
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
300 MWe
300 MWe
325 MWe
999 MWt
Construction Start Date First Criticality Date
01 Aug, 1993
03 May, 2000
First Grid Connection Commercial Operation Date
13 Jun, 2000
15 Sep, 2000

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
48.00 TW.h
79.0 %
81.0 %
21.0 %
78.0 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2000 529.150 300 1860 72.4 72.2 72.2 68.7 68.7
2001 1581.750 300 5918 67.6 60.1 62.8 60.2 62.1
2002 1356.000 300 4790 54.7 52.2 58.2 51.6 57.5
2003 1809.800 300 6879 78.5 68.8 61.4 68.9 61.0
2004 1750.710 300 5949 67.7 66.4 62.6 66.4 62.2
2005 2155.190 300 7458 85.1 81.9 66.2 82.0 66.0
2006 2532.910 300 8569 97.8 98.2 71.3 96.4 70.8
2007 1949.130 300 6669 76.1 75.2 71.8 74.2 71.3
2008 1356.450 300 4795 54.6 52.2 69.5 51.5 68.9
2009 2145.870 300 7379 84.2 82.8 70.9 81.6 70.2
2010 2095.760 300 7160 81.7 80.7 71.9 79.8 71.2
2011 2061.670 300 7008 80.0 79.3 72.5 78.4 71.8
2012 2489.250 300 8370 95.3 94.7 74.3 94.5 73.7
2013 2189.640 300 7481 85.4 84.0 75.1 83.3 74.4
2014 2178.220 300 7434 84.9 85.6 75.8 82.9 75.0
2015 1627.530 300 5831 66.6 64.3 75.0 61.9 74.1
2016 2326.460 300 8291 94.4 89.3 75.9 88.3 75.0
2017 2157.860 300 7391 84.4 82.5 76.3 82.1 75.4
2018 2017.020 300 6950 79.3 79.4 76.5 76.8 75.5
2019 2335.200 300 7907 90.3 90.2 77.2 88.9 76.2
2020 2277.560 300 7682 87.4 86.4 77.6 86.4 76.7
2021 2209.570 300 7546 86.1 85.8 78.0 84.1 77.0
2022 2330.600 300 8020 91.6 90.5 78.6 88.7 77.6
2023 2322.680 300 8131 92.8 88.1 79.0 88.4 78.0
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-09-18