DOUGLAS POINT

Permanent Shutdown


Reactor Details

Reactor Type Model Owner Operator
PHWR
CANDU 200
ATOMIC ENERGY OF CANADA, LTD.
ONTARIO HYDRO
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
206 MWe
203 MWe
218 MWe
704 MWt
Construction Start Date First Criticality Date
01 Feb, 1960
15 Nov, 1966
First Grid Connection Commercial Operation Date
07 Jan, 1967
26 Sep, 1968
Permanent Shutdown Date
04 May, 1984

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
15.63 TW.h
59.5 %
67.1 %
40.5 %
55.6 %
Lifetime performance calculated up to year 1984

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1967 Data from a trial operation not provided
1968 Data Not Provided
1969 "
1970 916.000 220 5155 59.0 47.7 NC 47.7 NC
1971 1044.500 220 5345 61.2 54.3 51.0 54.4 51.0
1972 356.500 220 1796 20.5 20.8 40.9 18.5 40.2
1973 1048.100 208 5672 63.7 62.9 46.2 56.6 44.1
1974 1129.600 207 6992 80.0 62.5 49.4 62.5 47.7
1975 1284.300 206 6702 76.7 71.4 52.9 71.4 51.5
1976 1089.500 206 5543 63.3 60.7 54.0 60.4 52.7
1977 772.000 206 5713 65.4 45.9 53.0 42.9 51.5
1978 855.200 206 6712 76.8 49.2 52.6 47.5 51.1
1979 1063.900 206 8161 92.2 66.8 54.0 58.3 51.8
1980 310.500 130 2436 27.7 27.1 52.4 27.2 50.4
1981 1109.400 206 7981 91.1 94.1 55.9 61.5 51.3
1982 1343.000 206 6703 76.5 74.7 57.4 74.4 53.1
1983 1401.200 206 6860 78.3 77.7 58.9 77.6 54.9
1984 538.970 206 2664 88.6 87.1 59.5 86.9 55.6
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS


Above data generated by the PRIS database. Last update on 2025-04-22


Previous  (DARLINGTON-4) (GENTILLY-1)  Next