BRUCE-6
Operational
Reactor Details
Reactor Type
Model
Owner
Operator
PHWR
CANDU 750B
Ontario Power Generation
Bruce Power
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
817
MW
e
822
MW
e
891
MW
e
2690
MW
t
Construction Start Date
First Criticality Date
01 Jan, 1978
29 May, 1984
First Grid Connection
Commercial Operation Date
26 Jun, 1984
14 Sep, 1984
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
206.77 TW.h
75.8 %
78.2 %
24.2 %
75.2 %
Lifetime performance calculated up to year
2023
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
1984
3068.320
795
4230
99.9
98.8
98.8
98.8
98.8
1985
5900.130
815
7369
84.1
84.0
87.7
83.7
87.4
1986
5716.030
837
7213
82.3
77.8
83.4
78.1
83.4
1987
7017.100
837
8610
98.3
95.3
87.0
95.7
87.1
1988
6139.490
837
7880
89.7
89.1
87.5
83.5
86.3
1989
5386.170
837
7069
80.7
73.4
84.8
73.5
83.8
1990
6213.640
860
7429
84.8
82.3
84.4
83.2
83.7
1991
7013.360
860
8194
93.5
93.0
85.6
93.1
85.1
1992
5328.200
860
6393
72.8
70.5
83.8
70.5
83.3
1993
4351.000
860
6950
79.3
58.0
81.0
57.8
80.5
1994
6451.710
860
8760
100.0
85.8
81.4
85.6
81.0
1995
4671.570
860
6049
69.0
62.1
79.7
62.0
79.3
1996
6822.750
860
8682
98.8
90.4
80.6
90.3
80.2
1997
4796.410
860
6201
70.8
63.7
79.3
63.7
78.9
1998
4678.620
785
6137
70.1
68.0
78.6
68.0
78.2
1999
6860.150
785
8760
100.0
99.3
79.8
99.8
79.5
2000
4668.210
785
5912
67.3
66.8
79.1
67.7
78.9
2001
6840.060
790
8624
98.4
98.3
80.1
98.8
80.0
2002
3522.450
790
4539
51.8
50.6
78.6
50.9
78.4
2003
6750.850
790
8559
97.7
98.2
79.6
97.6
79.4
2004
5379.090
841
6698
76.2
76.6
79.4
75.4
79.2
2005
5721.100
822
7151
81.6
79.6
79.4
78.9
79.2
2006
7104.450
822
8760
100.0
99.3
80.3
98.7
80.0
2007
5145.020
822
6363
72.6
71.8
80.0
71.4
79.7
2008
6857.250
817
8452
96.2
95.4
80.6
95.6
80.3
2009
6063.070
817
7732
88.3
91.3
81.0
84.7
80.5
2010
5471.910
817
6815
77.8
76.5
80.8
76.5
80.4
2011
6552.520
817
8277
94.5
94.0
81.3
91.6
80.8
2012
7125.320
817
8784
100.0
99.6
81.9
99.3
81.4
2013
5684.000
817
7174
81.9
81.0
81.9
79.4
81.3
2014
6768.620
817
8488
96.9
97.7
82.4
94.6
81.8
2015
5344.310
817
6694
76.4
76.2
82.2
74.7
81.5
2016
6875.210
817
8613
98.0
97.1
82.7
95.8
82.0
2017
5741.560
817
7164
81.8
81.0
82.6
80.2
81.9
2018
7059.650
817
8718
99.5
99.0
83.1
98.6
82.4
2019
6498.250
817
8224
93.9
91.7
83.4
90.8
82.6
2020
313.800
817
408
4.6
4.7
81.2
4.4
80.5
2021
0.000
817
0
0.0
0.0
79.0
0.0
78.4
2022
0.000
817
0
0.0
0.0
77.0
0.0
76.3
2023
2197.130
817
2759
31.5
30.8
75.8
30.7
75.2
Performance indicators are calculated from the Commercial Operation Date.
Above data generated by the PRIS database. Last update on 2024-09-18
Previous
(BRUCE-5)
(BRUCE-7)
Next
CANADA
BRUCE-1
BRUCE-2
BRUCE-3
BRUCE-4
BRUCE-5
BRUCE-6
BRUCE-7
BRUCE-8
DARLINGTON-1
DARLINGTON-2
DARLINGTON-3
DARLINGTON-4
DOUGLAS POINT
GENTILLY-1
GENTILLY-2
PICKERING-1
PICKERING-2
PICKERING-3
PICKERING-4
PICKERING-5
PICKERING-6
PICKERING-7
PICKERING-8
POINT LEPREAU
ROLPHTON NPD