KASHIWAZAKI KARIWA-4

Suspended Operation


Reactor Details

Reactor Type Model Owner Operator
BWR
BWR-5
Tokyo Electric Power Company Holdings, Inc.
Tokyo Electric Power Company Holdings, Inc.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1067 MWe
1067 MWe
1100 MWe
3293 MWt
Construction Start Date First Criticality Date
05 Mar, 1990
01 Nov, 1993
First Grid Connection Commercial Operation Date Suspended Operation Date
21 Dec, 1993
11 Aug, 1994
11 Feb, 2008

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
91.85 TW.h
35.3 %
35.4 %
64.7 %
35.0 %
Lifetime performance calculated up to year 2021

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1993 11.600 1067 74
1994 6040.100 1067 6638 100.0 99.8 99.8 98.8 98.8
1995 6182.460 1067 5889 67.2 67.0 76.7 66.1 75.8
1996 8067.980 1067 7651 87.1 87.0 81.0 86.1 80.0
1997 7516.710 1067 7207 82.3 81.5 81.1 80.4 80.2
1998 9258.690 1067 8760 100.0 100.0 85.4 99.1 84.4
1999 8141.740 1067 7719 88.1 88.1 85.9 87.1 84.9
2000 6918.930 1067 6602 75.2 75.1 84.2 73.8 83.2
2001 5591.430 1067 5343 61.0 60.6 81.0 59.8 80.0
2002 9239.860 1067 8760 100.0 99.9 83.3 98.8 82.3
2003 4185.830 1067 3946 45.0 45.0 79.2 44.8 78.3
2004 5623.720 1067 5258 59.9 59.9 77.4 60.0 76.5
2005 7192.000 1067 6755 77.1 76.8 77.3 77.0 76.6
2006 2816.500 1067 2772 31.6 30.4 73.5 30.1 72.8
2007 5061.670 1067 4714 53.8 53.8 72.1 54.2 71.4
2008 0.000 1067 0 0.0 0.0 67.0 0.0 66.5
2009 0.000 1067 0 0.0 0.0 62.7 0.0 62.2
2010 0.000 1067 0 0.0 0.0 58.9 0.0 58.4
2011 0.000 1067 0 0.0 0.0 55.5 0.0 55.0
2012 0.000 1067 0 0.0 0.0 52.5 0.0 52.0
2013 0.000 1067 0 0.0 0.0 49.8 0.0 49.4
2014 0.000 1067 0 0.0 0.0 47.4 0.0 47.0
2015 0.000 1067 0 0.0 0.0 45.1 0.0 44.8
2016 0.000 1067 0 0.0 0.0 43.1 0.0 42.8
2017 0.000 1067 0 0.0 0.0 41.3 0.0 40.9
2018 0.000 1067 0 0.0 0.0 39.6 0.0 39.3
2019 0.000 1067 0 0.0 0.0 38.0 0.0 37.7
2020 0.000 1067 0 0.0 0.0 36.6 0.0 36.3
2021 0.000 1067 0 0.0 0.0 35.3 0.0 35.0
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2025-01-25


Previous  (KASHIWAZAKI KARIWA-3) (KASHIWAZAKI KARIWA-5)  Next