Skip to content
Skip to navigation
Contact Us
IAEA.org
NUCLEUS
World Statistics
Country Statistics
Publications
Glossary
About PRIS
SHIMANE-2
Suspended Operation
Reactor Details
Reactor Type
Model
Owner
Operator
BWR
BWR-5
THE CHUGOKU ELECTRIC POWER CO., INC.
THE CHUGOKU ELECTRIC POWER CO., INC.
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
789
MW
e
789
MW
e
820
MW
e
2436
MW
t
Construction Start Date
First Criticality Date
02 Feb, 1985
25 May, 1988
First Grid Connection
Commercial Operation Date
Suspended Operation Date
11 Jul, 1988
10 Feb, 1989
17 Jan, 2012
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
129.18 TW.h
56.1 %
56.3 %
43.9 %
56.0 %
Lifetime performance calculated up to year
2021
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
1988
1317.120
791
2474
1989
5852.060
791
7485
89.6
89.2
89.2
88.8
88.8
1990
5123.510
790
6592
75.2
74.0
81.3
74.0
81.1
1991
5544.500
790
7121
81.3
80.1
80.9
80.1
80.8
1992
5516.140
790
7072
80.5
79.7
80.6
79.5
80.4
1993
6756.900
790
8592
98.1
97.8
84.1
97.6
83.9
1994
5547.270
790
7071
80.7
80.6
83.5
80.2
83.3
1995
5363.610
790
6888
78.6
77.8
82.7
77.5
82.5
1996
5583.690
790
7166
81.6
80.8
82.4
80.5
82.2
1997
6903.190
789
8760
100.0
100.0
84.4
99.9
84.2
1998
5962.470
789
7600
86.8
86.5
84.6
86.3
84.4
1999
5758.720
789
7319
83.6
83.5
84.5
83.3
84.3
2000
6083.960
789
7747
88.2
88.1
84.8
87.8
84.6
2001
6901.040
789
8760
100.0
100.0
86.0
99.8
85.8
2002
6055.090
789
7678
87.6
87.6
86.1
87.6
85.9
2003
4836.240
789
6133
70.0
70.0
85.0
70.0
84.8
2004
4097.560
789
5202
59.2
59.0
83.4
59.1
83.2
2005
5907.460
789
7544
86.1
85.4
83.5
85.5
83.4
2006
5085.400
789
6469
73.8
73.6
83.0
73.6
82.8
2007
5462.010
789
6970
79.6
79.5
82.8
79.0
82.6
2008
4703.600
789
6001
68.3
68.2
82.0
67.9
81.9
2009
5373.850
789
6799
77.6
77.5
81.8
77.8
81.7
2010
1924.420
789
2438
27.8
27.6
79.4
27.8
79.2
2011
6921.960
789
8760
100.0
100.0
80.2
100.2
80.1
2012
491.690
789
625
7.1
7.1
77.2
7.1
77.1
2013
0.000
789
0
0.0
0.0
74.1
0.0
74.0
2014
0.000
789
0
0.0
0.0
71.2
0.0
71.1
2015
0.000
789
0
0.0
0.0
68.6
0.0
68.5
2016
0.000
789
0
0.0
0.0
66.1
0.0
66.0
2017
0.000
789
0
0.0
0.0
63.8
0.0
63.8
2018
0.000
789
0
0.0
0.0
61.7
0.0
61.6
2019
0.000
789
0
0.0
0.0
59.7
0.0
59.6
2020
0.000
789
0
0.0
0.0
57.8
0.0
57.8
2021
0.000
789
0
0.0
0.0
56.1
0.0
56.0
Performance indicators are calculated from the Commercial Operation Date.
Above data generated by the PRIS database. Last update on 2024-09-10
Previous
(SHIMANE-1)
(SHIMANE-3)
Next
JAPAN
FUGEN ATR
FUKUSHIMA-DAIICHI-1
FUKUSHIMA-DAIICHI-2
FUKUSHIMA-DAIICHI-3
FUKUSHIMA-DAIICHI-4
FUKUSHIMA-DAIICHI-5
FUKUSHIMA-DAIICHI-6
FUKUSHIMA-DAINI-1
FUKUSHIMA-DAINI-2
FUKUSHIMA-DAINI-3
FUKUSHIMA-DAINI-4
GENKAI-1
GENKAI-2
GENKAI-3
GENKAI-4
HAMAOKA-1
HAMAOKA-2
HAMAOKA-3
HAMAOKA-4
HAMAOKA-5
HIGASHI DORI-1 (TOHOKU)
IKATA-1
IKATA-2
IKATA-3
JPDR
KASHIWAZAKI KARIWA-1
KASHIWAZAKI KARIWA-2
KASHIWAZAKI KARIWA-3
KASHIWAZAKI KARIWA-4
KASHIWAZAKI KARIWA-5
KASHIWAZAKI KARIWA-6
KASHIWAZAKI KARIWA-7
MIHAMA-1
MIHAMA-2
MIHAMA-3
MONJU
OHI-1
OHI-2
OHI-3
OHI-4
OHMA
ONAGAWA-1
ONAGAWA-2
ONAGAWA-3
SENDAI-1
SENDAI-2
SHIKA-1
SHIKA-2
SHIMANE-1
SHIMANE-2
SHIMANE-3
TAKAHAMA-1
TAKAHAMA-2
TAKAHAMA-3
TAKAHAMA-4
TOKAI-1
TOKAI-2
TOMARI-1
TOMARI-2
TOMARI-3
TSURUGA-1
TSURUGA-2