PICKERING-7
Operational
Reactor Details
Reactor Type
Model
Owner
Operator
PHWR
CANDU 500B
Ontario Power Generation
Ontario Power Generation
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
516
MW
e
516
MW
e
540
MW
e
1744
MW
t
Construction Start Date
First Criticality Date
01 Mar, 1976
22 Oct, 1984
First Grid Connection
Commercial Operation Date
17 Nov, 1984
01 Jan, 1985
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
138.96 TW.h
78.7 %
81.3 %
21.3 %
78.6 %
Lifetime performance calculated up to year
2023
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
1984
312.700
516
861
1985
4093.950
516
8277
94.5
92.6
92.6
90.6
90.6
1986
3373.300
516
7002
79.9
75.2
83.9
74.6
82.6
1987
4339.890
516
8642
98.6
96.0
88.0
96.0
87.1
1988
4340.420
516
8519
97.0
95.4
89.8
95.8
89.2
1989
3408.690
516
6939
79.2
75.4
86.9
75.4
86.5
1990
3500.800
516
7420
84.7
77.7
85.4
77.4
85.0
1991
4258.770
516
8436
96.3
94.5
86.7
94.2
86.3
1992
3727.450
516
7349
83.7
82.4
86.2
82.2
85.8
1993
4415.950
516
8760
100.0
99.0
87.6
97.7
87.1
1994
3709.910
516
7386
84.3
83.4
87.2
82.1
86.6
1995
4056.790
516
8140
92.9
90.0
87.4
89.8
86.9
1996
2050.690
516
4416
50.3
45.4
83.9
45.2
83.4
1997
2936.160
516
6208
70.9
65.0
82.5
65.0
82.0
1998
3084.730
516
6495
74.1
68.2
81.4
68.2
81.0
1999
4433.820
516
8751
99.9
98.0
82.6
98.1
82.2
2000
2099.000
516
4445
50.6
46.3
80.3
46.3
79.9
2001
4020.780
516
7968
91.0
88.7
80.8
89.0
80.4
2002
4246.890
516
8538
97.5
93.8
81.5
94.0
81.2
2003
1790.660
516
3811
43.5
39.7
79.3
39.6
79.0
2004
3116.060
516
6127
69.8
68.9
78.8
68.8
78.5
2005
4390.760
516
8658
98.8
97.4
79.7
97.1
79.4
2006
2652.570
516
5311
60.6
59.1
78.7
58.7
78.4
2007
3667.910
516
7540
86.1
81.7
78.9
81.2
78.6
2008
1530.270
516
3084
35.1
34.0
77.0
33.8
76.7
2009
4229.460
516
8492
96.9
94.1
77.7
93.6
77.4
2010
2920.660
516
5895
67.3
64.8
77.2
64.6
76.9
2011
4337.700
516
8673
99.0
96.6
77.9
96.0
77.6
2012
2920.020
516
5965
67.9
64.8
77.4
64.4
77.1
2013
4264.550
516
8760
100.0
94.4
78.0
94.4
77.7
2014
2783.080
516
5489
62.7
62.0
77.5
61.6
77.2
2015
4171.040
516
8336
95.2
92.6
78.0
92.3
77.6
2016
2803.590
516
5574
63.5
62.0
77.5
61.8
77.2
2017
3751.370
516
7512
85.8
83.1
77.6
83.0
77.3
2018
4377.160
516
8687
99.2
96.7
78.2
96.8
77.9
2019
3132.650
516
6131
70.0
68.5
77.9
69.3
77.7
2020
4316.410
516
8321
94.7
94.0
78.4
95.2
78.2
2021
2840.990
516
5532
63.2
62.1
77.9
62.8
77.7
2022
4161.580
516
7970
91.0
90.5
78.2
92.1
78.1
2023
4324.260
516
8340
95.2
94.4
78.7
95.7
78.6
Performance indicators are calculated from the Commercial Operation Date.
Above data generated by the PRIS database. Last update on 2024-09-18
Previous
(PICKERING-6)
(PICKERING-8)
Next
CANADA
BRUCE-1
BRUCE-2
BRUCE-3
BRUCE-4
BRUCE-5
BRUCE-6
BRUCE-7
BRUCE-8
DARLINGTON-1
DARLINGTON-2
DARLINGTON-3
DARLINGTON-4
DOUGLAS POINT
GENTILLY-1
GENTILLY-2
PICKERING-1
PICKERING-2
PICKERING-3
PICKERING-4
PICKERING-5
PICKERING-6
PICKERING-7
PICKERING-8
POINT LEPREAU
ROLPHTON NPD