FUGEN ATR

Permanent Shutdown


Reactor Details

Reactor Type Model Owner Operator
HWLWR
ATR
JAPAN ATOMIC ENERGY AGENCY
JAPAN ATOMIC ENERGY AGENCY
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
148 MWe
148 MWe
165 MWe
557 MWt
Construction Start Date First Criticality Date
10 May, 1972
20 Mar, 1978
First Grid Connection Commercial Operation Date
29 Jul, 1978
20 Mar, 1979
Permanent Shutdown Date
29 Mar, 2003

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
8.45 TW.h
61.9 %
63.7 %
38.1 %
61.9 %
Lifetime performance calculated up to year 2003

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1978 144.330 148 1793
1979 1009.600 150 7322 87.7 83.3 83.3 83.3 83.3
1980 630.700 148 4523 51.5 48.5 63.6 48.5 63.6
1981 242.800 148 1840 21.0 18.7 47.4 18.7 47.4
1982 819.220 148 5706 65.1 63.2 51.6 63.2 51.6
1983 1106.000 148 7724 88.2 85.6 58.7 85.3 58.6
1984 767.050 148 5502 62.6 59.1 58.8 59.0 58.7
1985 670.690 148 4661 53.2 52.0 57.8 51.7 57.7
1986 1034.420 148 7221 82.4 80.8 60.7 79.8 60.5
1987 725.680 148 5055 57.7 56.3 60.2 56.0 60.0
1988 1015.420 148 6976 79.4 78.6 62.1 78.1 61.9
1989 809.090 148 5656 64.6 62.7 62.2 62.4 61.9
1990 1081.100 148 7526 85.9 84.1 64.0 83.4 63.7
1991 671.280 148 4728 54.0 52.6 63.1 51.8 62.8
1992 933.870 148 6397 72.8 71.8 63.8 71.8 63.5
1993 857.250 148 5915 67.5 66.1 63.9 66.1 63.6
1994 1182.830 148 8040 91.8 91.2 65.7 91.2 65.4
1995 797.030 148 5491 62.7 61.5 65.4 61.5 65.2
1996 991.230 148 6751 76.9 76.2 66.0 76.2 65.8
1997 520.810 148 3656 41.7 40.2 64.6 40.2 64.4
1998 1186.370 148 8085 92.3 91.5 66.0 91.5 65.8
1999 445.440 148 2806 32.0 30.1 64.1 31.4 64.0
2000 569.300 148 3964 45.1 43.8 63.2 43.8 63.0
2001 507.460 148 3430 39.2 39.1 62.1 39.1 62.0
2002 606.280 148 4528 51.7 46.8 61.5 46.8 61.4
2003 345.520 148 2095 99.2 99.3 61.9 110.5 61.9
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-09-10