PICKERING-6
Operational
Reactor Details
Reactor Type
Model
Owner
Operator
PHWR
CANDU 500B
Ontario Power Generation
Ontario Power Generation
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
516
MW
e
516
MW
e
540
MW
e
1744
MW
t
Construction Start Date
First Criticality Date
01 Oct, 1975
15 Oct, 1983
First Grid Connection
Commercial Operation Date
08 Nov, 1983
01 Feb, 1984
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
142.17 TW.h
78.5 %
81.2 %
21.5 %
78.5 %
Lifetime performance calculated up to year
2023
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
1983
257.700
516
856
1984
3816.080
516
7636
87.7
86.1
86.1
85.9
85.9
1985
3289.090
516
6540
74.7
73.1
79.3
72.8
79.0
1986
3395.220
516
6763
77.2
75.8
78.1
75.1
77.7
1987
3949.930
516
7791
88.9
86.6
80.3
87.4
80.2
1988
4496.760
516
8775
99.9
98.4
84.0
99.2
84.0
1989
3950.210
516
7794
89.0
87.6
84.6
87.4
84.6
1990
3473.450
516
7017
80.1
76.9
83.5
76.8
83.5
1991
4469.680
516
8721
99.6
99.0
85.4
98.9
85.4
1992
4050.470
516
7936
90.4
89.3
85.9
89.4
85.9
1993
2689.190
516
5506
62.8
59.9
83.2
59.5
83.2
1994
4043.000
516
8036
91.7
90.1
83.9
89.4
83.8
1995
3493.340
516
6962
79.5
77.2
83.3
77.3
83.2
1996
2591.650
516
5707
65.0
57.2
81.3
57.2
81.2
1997
3386.160
516
6841
78.1
74.9
80.8
74.9
80.8
1998
3130.150
516
6384
72.9
69.2
80.1
69.2
80.0
1999
3353.710
516
6863
78.3
74.2
79.7
74.2
79.6
2000
2738.740
516
6449
73.4
60.5
78.6
60.4
78.5
2001
2618.080
516
5286
60.3
57.7
77.4
57.9
77.4
2002
3982.310
516
7985
91.2
88.3
78.0
88.1
77.9
2003
3267.370
516
6566
75.0
72.5
77.7
72.3
77.6
2004
2780.800
516
5597
63.7
61.5
76.9
61.4
76.8
2005
2850.130
516
5596
63.9
63.1
76.3
63.0
76.2
2006
3899.460
516
7635
87.2
86.0
76.7
86.3
76.7
2007
3216.520
516
6588
75.2
70.8
76.5
71.2
76.4
2008
4323.780
516
8521
97.0
95.6
77.2
95.4
77.2
2009
3493.230
516
7051
80.5
77.6
77.2
77.3
77.2
2010
3865.260
516
7659
87.4
85.8
77.6
85.5
77.5
2011
3195.820
516
6334
72.3
71.0
77.3
70.7
77.3
2012
4333.570
516
8550
97.3
95.5
78.0
95.6
77.9
2013
3027.430
516
6047
69.0
67.2
77.6
67.0
77.5
2014
3979.300
516
8397
95.9
87.9
77.9
88.0
77.9
2015
3037.960
516
6064
69.2
67.3
77.6
67.2
77.5
2016
3995.280
516
8259
94.0
88.2
77.9
88.2
77.9
2017
4434.180
516
8686
99.2
98.3
78.5
98.1
78.5
2018
2652.580
516
5392
61.6
58.7
78.0
58.7
77.9
2019
4461.280
516
8681
99.1
98.3
78.5
98.7
78.5
2020
3027.010
516
5918
67.4
66.7
78.2
66.8
78.2
2021
4206.840
516
8455
96.5
93.0
78.6
93.1
78.6
2022
4022.030
516
7845
89.6
88.9
78.8
89.0
78.8
2023
2930.520
516
5826
66.5
65.1
78.5
64.8
78.5
Performance indicators are calculated from the Commercial Operation Date.
Above data generated by the PRIS database. Last update on 2024-09-10
Previous
(PICKERING-5)
(PICKERING-7)
Next
CANADA
BRUCE-1
BRUCE-2
BRUCE-3
BRUCE-4
BRUCE-5
BRUCE-6
BRUCE-7
BRUCE-8
DARLINGTON-1
DARLINGTON-2
DARLINGTON-3
DARLINGTON-4
DOUGLAS POINT
GENTILLY-1
GENTILLY-2
PICKERING-1
PICKERING-2
PICKERING-3
PICKERING-4
PICKERING-5
PICKERING-6
PICKERING-7
PICKERING-8
POINT LEPREAU
ROLPHTON NPD