GENKAI-1

Permanent Shutdown


Reactor Details

Reactor Type Model Owner Operator
PWR
M (2-loop)
Kyushu Electric Power Co., Inc.
Kyushu Electric Power Co., Inc.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
529 MWe
529 MWe
559 MWe
1650 MWt
Construction Start Date First Criticality Date
15 Sep, 1971
28 Jan, 1975
First Grid Connection Commercial Operation Date
14 Feb, 1975
15 Oct, 1975
Permanent Shutdown Date
27 Apr, 2015

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
127.67 TW.h
67.8 %
69.0 %
32.2 %
68.4 %
Lifetime performance calculated up to year 2015

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1975 1850.600 529 4469 100.0 89.2 89.2 89.1 89.1
1976 3652.700 559 7022 79.9 74.4 77.2 74.4 77.2
1977 3785.000 532 7764 88.6 83.4 79.9 81.2 79.0
1978 3415.800 529 6681 76.3 73.7 78.0 73.7 77.4
1979 2219.800 531 4390 50.1 47.7 71.0 47.7 70.5
1980 3533.000 529 6772 77.1 75.6 71.9 76.0 71.5
1981 2739.800 529 5309 60.6 58.9 69.8 59.1 69.6
1982 3744.700 529 7072 80.7 80.7 71.3 80.8 71.1
1983 3960.500 529 7678 87.6 85.4 73.0 85.5 72.8
1984 3139.740 529 6072 69.1 67.5 72.4 67.6 72.3
1985 3089.680 529 6056 69.1 66.7 71.8 66.7 71.7
1986 2867.190 529 5425 61.9 61.8 71.0 61.9 70.8
1987 3762.710 529 7285 83.2 81.1 71.8 81.2 71.7
1988 2365.620 529 4743 54.0 51.0 70.2 50.9 70.1
1989 2183.230 529 4310 49.2 47.1 68.6 47.1 68.5
1990 2725.660 529 5159 58.9 58.8 68.0 58.8 67.9
1991 3357.540 529 6542 74.7 72.4 68.2 72.4 68.2
1992 3291.700 529 6397 72.8 70.7 68.4 70.8 68.3
1993 2797.430 529 5459 62.3 60.3 68.0 60.4 67.9
1994 2530.590 529 4787 54.6 54.5 67.2 54.6 67.2
1995 4150.960 529 7842 89.5 89.4 68.3 89.6 68.3
1996 4107.850 529 7829 89.1 88.3 69.3 88.4 69.2
1997 3653.410 529 6984 79.7 78.7 69.7 78.8 69.7
1998 3703.180 529 7057 80.6 79.8 70.1 79.9 70.1
1999 3305.930 529 6362 72.6 71.2 70.2 71.3 70.2
2000 4435.550 529 8400 95.6 95.3 71.2 95.5 71.2
2001 2512.270 529 4745 54.2 54.1 70.5 54.2 70.5
2002 3822.920 529 7097 81.0 81.0 70.9 82.5 71.0
2003 3622.800 529 6692 76.4 76.4 71.1 78.2 71.2
2004 4768.400 529 8784 100.0 100.0 72.1 102.6 72.3
2005 3310.780 529 6180 70.6 69.7 72.0 71.4 72.3
2006 3722.570 529 6891 78.7 78.0 72.2 80.3 72.5
2007 4299.350 529 7873 89.9 89.8 72.8 92.8 73.1
2008 4104.120 529 7545 85.9 85.3 73.1 88.3 73.6
2009 3817.410 529 6987 79.8 79.1 73.3 82.4 73.9
2010 3832.770 529 6988 79.8 79.2 73.5 82.7 74.1
2011 4425.430 529 8034 91.7 91.6 74.0 95.5 74.7
2012 0.000 529 0 0.0 0.0 72.0 0.0 72.7
2013 0.000 529 0 0.0 0.0 70.1 0.0 70.8
2014 0.000 529 0 0.0 0.0 68.3 0.0 69.0
2015 0.000 529 0 0.0 0.0 67.8 0.0 68.4
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-10-03