JPDR (Japan Power Demonstration Reactor)

Permanent Shutdown


Reactor Details

Reactor Type Model Owner Operator
BWR
BWR-1
JAPAN ATOMIC ENERGY AGENCY
JAPAN ATOMIC ENERGY AGENCY
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
12 MWe
10 MWe
13 MWe
90 MWt
Construction Start Date First Criticality Date
01 Dec, 1960
22 Aug, 1963
First Grid Connection Commercial Operation Date
26 Oct, 1963
15 Mar, 1965
Permanent Shutdown Date
18 Mar, 1976

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
0.01 TW.h
NC
NC
NC
NC
Lifetime performance calculated up to year 1976

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1963 Data from a trial operation not provided
1964 "
1965 Data Not Provided
1966 "
1967 "
1968 "
1969 "
1970 "
1971 "
1972 "
1973 "
1974 0.000 12 0 0.0 -4.2 NC 0.0 NC
1975 6.500 12 920 10.5 2.0 NC 6.2 NC
1976 4.300 12 454 20.8 12.2 NC 16.4 NC
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS


Above data generated by the PRIS database. Last update on 2024-09-18