PICKERING-5
Operational
Reactor Details
Reactor Type
Model
Owner
Operator
PHWR
CANDU 500B
Ontario Power Generation
Ontario Power Generation
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
516
MW
e
516
MW
e
540
MW
e
1744
MW
t
Construction Start Date
First Criticality Date
01 Nov, 1974
23 Oct, 1982
First Grid Connection
Commercial Operation Date
19 Dec, 1982
10 May, 1983
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
137.02 TW.h
74.5 %
78.0 %
25.5 %
74.3 %
Lifetime performance calculated up to year
2023
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
1982
11.200
516
240
1983
3202.400
516
6968
92.6
90.3
90.3
89.6
89.6
1984
3517.520
516
7035
80.1
77.8
82.8
77.6
82.4
1985
3366.500
516
6989
79.8
77.7
80.9
74.5
79.5
1986
4068.640
516
8057
92.0
90.7
83.6
90.0
82.3
1987
3600.100
516
7148
81.6
79.6
82.7
79.6
81.8
1988
4397.160
516
8683
98.8
97.5
85.3
97.0
84.4
1989
3400.760
516
6862
78.3
75.4
83.8
75.2
83.1
1990
3885.000
516
7821
89.3
86.4
84.2
86.0
83.4
1991
2887.060
516
5724
65.3
64.4
81.9
63.9
81.2
1992
1345.250
516
2621
29.8
29.8
76.5
29.7
75.8
1993
3841.810
516
8307
94.8
85.4
77.3
85.0
76.7
1994
3074.410
516
6196
70.7
68.5
76.6
68.0
76.0
1995
3372.870
516
7008
80.0
74.8
76.4
74.6
75.9
1996
3042.630
516
6429
73.2
67.1
75.7
67.1
75.2
1997
3924.890
516
7908
90.3
86.8
76.5
86.8
76.0
1998
3490.580
516
7296
83.3
77.2
76.6
77.2
76.1
1999
2511.570
516
5302
60.5
55.6
75.3
55.6
74.9
2000
2631.490
516
5457
62.1
58.0
74.3
58.1
73.9
2001
2980.210
516
5986
68.3
65.9
73.9
65.9
73.5
2002
2655.740
516
5565
63.5
58.8
73.1
58.8
72.7
2003
3294.960
516
6566
75.0
69.1
72.9
72.9
72.7
2004
4159.810
516
8264
94.1
92.2
73.8
91.8
73.6
2005
2352.790
516
4818
55.0
52.6
72.9
52.0
72.7
2006
4010.870
516
8113
92.6
89.0
73.5
88.7
73.4
2007
2567.590
516
5637
64.4
57.0
72.9
56.8
72.7
2008
4026.820
516
8357
95.1
88.9
73.5
88.8
73.3
2009
3140.880
516
6631
75.7
69.6
73.3
69.5
73.2
2010
3769.850
516
7645
87.3
83.7
73.7
83.4
73.5
2011
1973.460
516
4258
48.6
43.9
72.7
43.7
72.5
2012
4347.310
516
8725
99.3
96.3
73.5
95.9
73.3
2013
2603.230
516
5371
61.3
58.1
73.0
57.6
72.8
2014
4255.090
516
8760
100.0
94.6
73.7
94.1
73.4
2015
2932.280
516
5865
67.0
65.3
73.4
64.9
73.2
2016
4352.120
516
8784
100.0
96.6
74.1
96.0
73.9
2017
2883.680
516
5841
66.7
64.1
73.8
63.8
73.6
2018
4255.380
516
8615
98.3
94.8
74.4
94.1
74.2
2019
2978.820
516
5934
67.7
66.3
74.2
65.9
73.9
2020
4215.360
516
8520
97.0
93.1
74.7
93.0
74.4
2021
3187.450
516
6438
73.5
70.6
74.6
70.5
74.3
2022
2386.740
516
4852
55.4
53.2
74.0
52.8
73.8
2023
4208.080
516
8437
96.3
93.5
74.5
93.1
74.3
Performance indicators are calculated from the Commercial Operation Date.
Above data generated by the PRIS database. Last update on 2024-09-10
Previous
(PICKERING-4)
(PICKERING-6)
Next
CANADA
BRUCE-1
BRUCE-2
BRUCE-3
BRUCE-4
BRUCE-5
BRUCE-6
BRUCE-7
BRUCE-8
DARLINGTON-1
DARLINGTON-2
DARLINGTON-3
DARLINGTON-4
DOUGLAS POINT
GENTILLY-1
GENTILLY-2
PICKERING-1
PICKERING-2
PICKERING-3
PICKERING-4
PICKERING-5
PICKERING-6
PICKERING-7
PICKERING-8
POINT LEPREAU
ROLPHTON NPD