BUSHEHR-1

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
VVER V-446
Nuclear Power Production and Development Co. of Iran
Nuclear Power Production and Development Co. of Iran
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
915 MWe
915 MWe
1000 MWe
3000 MWt
Construction Start Date First Criticality Date Construction Suspension Date Construction Restart Date
01 May, 1975
08 May, 2011
01 Jan, 1978
01 Jan, 1996
First Grid Connection Commercial Operation Date
03 Sep, 2011
23 Sep, 2013

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
58.03 TW.h
73.7 %
68.4 %
26.3 %
66.2 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2011 97.980 915 361
2012 1328.310 915 1930
2013 3893.670 915 4523 95.5 95.1 95.1 95.4 95.4
2014 3723.600 915 5181 59.1 56.4 64.2 46.5 56.3
2015 3198.240 915 3992 45.6 64.4 64.3 39.9 49.0
2016 5923.970 915 6615 75.3 73.9 67.2 73.7 56.6
2017 6366.210 915 6971 79.6 80.0 70.2 79.4 62.0
2018 6300.120 915 6851 78.2 77.5 71.6 78.6 65.2
2019 5865.730 915 6611 75.5 72.5 71.8 73.2 66.4
2020 5792.220 915 6349 72.3 71.0 71.7 72.1 67.2
2021 3235.970 915 3665 41.8 69.3 71.4 40.4 64.0
2022 6008.020 915 6544 74.7 91.8 73.6 75.0 65.2
2023 6071.160 915 6605 75.4 74.8 73.7 75.7 66.2
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-09-18