KAIGA-4

Operational


Reactor Details

Reactor Type Model Owner Operator
PHWR
Horizontal Pressure Tube type
NUCLEAR POWER CORPORATION OF INDIA, LTD.
NUCLEAR POWER CORPORATION OF INDIA, LTD.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
202 MWe
202 MWe
220 MWe
800 MWt
Construction Start Date First Criticality Date
10 May, 2002
27 Nov, 2010
First Grid Connection Commercial Operation Date
19 Jan, 2011
20 Jan, 2011

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
20.74 TW.h
87.1 %
91.7 %
12.9 %
90.6 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2011 1166.350 202 7720 92.6 71.7 71.7 70.5 70.5
2012 1180.550 202 8585 97.7 67.5 69.5 66.5 68.4
2013 1187.630 202 6706 76.6 67.7 68.9 67.1 68.0
2014 1465.780 202 7411 84.6 83.2 72.5 82.8 71.8
2015 1662.230 202 7770 88.7 88.8 75.8 93.9 76.3
2016 1847.310 202 8618 98.1 98.1 79.6 104.1 81.0
2017 1682.540 202 7896 90.1 90.2 81.2 95.1 83.0
2018 1799.010 202 8415 96.1 96.1 83.0 101.7 85.4
2019 1813.170 202 8494 97.0 97.0 84.6 102.5 87.3
2020 1619.090 202 7637 86.9 87.1 84.8 91.2 87.7
2021 1830.050 202 8609 98.3 98.3 86.1 103.4 89.1
2022 1670.850 202 7829 89.4 89.4 86.4 94.4 89.6
2023 1811.380 202 8413 96.0 96.1 87.1 102.4 90.6
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2025-01-25