ANGRA-2

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
PRE KONVOI
ELETRONUCLEAR S.A.
ELETRONUCLEAR S.A.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1275 MWe
1245 MWe
1350 MWe
3764 MWt
Construction Start Date First Criticality Date
01 Jan, 1976
14 Jul, 2000
First Grid Connection Commercial Operation Date
21 Jul, 2000
01 Feb, 2001

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
219.16 TW.h
86.2 %
88.3 %
13.8 %
84.2 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2000 2421.170 1350 2914
2001 9904.990 1350 8315 97.3 94.2 94.2 85.7 85.7
2002 9238.240 1275 8060 92.0 83.3 88.7 82.7 84.2
2003 9418.970 1275 8019 91.5 84.3 87.2 84.3 84.2
2004 6919.820 1275 6497 74.0 72.8 83.6 61.8 78.6
2005 5676.660 1275 5581 63.7 63.7 79.6 50.8 73.0
2006 9778.320 1275 8014 91.5 89.3 81.2 87.6 75.4
2007 9096.950 1275 7606 86.8 84.7 81.7 81.4 76.3
2008 9894.030 1275 7924 90.2 89.1 82.6 88.3 77.8
2009 9554.650 1275 8068 92.1 91.7 83.6 85.6 78.7
2010 9697.440 1275 7727 88.2 87.1 84.0 86.8 79.5
2011 10342.260 1275 8682 99.1 99.0 85.4 92.6 80.7
2012 10035.500 1275 8064 91.8 89.5 85.7 89.6 81.4
2013 10045.270 1275 7961 90.9 90.1 86.0 89.9 82.1
2014 9756.540 1275 7754 88.5 86.6 86.1 87.4 82.5
2015 10023.960 1275 7990 91.2 89.4 86.3 89.8 83.0
2016 10163.340 1275 7939 90.4 90.0 86.5 90.8 83.4
2017 10887.540 1275 8521 97.3 97.0 87.2 97.5 84.3
2018 10091.650 1275 8011 91.4 89.5 87.3 90.4 84.6
2019 9984.430 1275 7895 90.1 88.8 87.4 89.4 84.8
2020 8897.220 1275 7423 84.5 79.4 87.0 79.4 84.6
2021 9012.510 1275 7497 85.6 80.5 86.7 80.7 84.4
2022 9142.510 1275 7171 81.9 81.6 86.4 81.9 84.3
2023 9179.950 1275 7228 82.5 81.9 86.2 82.2 84.2
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2025-04-22