CIVAUX-2

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
N4 REP 1450
ÉLECTRICITÉ DE FRANCE
ÉLECTRICITÉ DE FRANCE
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1495 MWe
1450 MWe
1561 MWe
4270 MWt
Construction Start Date First Criticality Date
01 Apr, 1991
27 Nov, 1999
First Grid Connection Commercial Operation Date
24 Dec, 1999
23 Apr, 2002

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
214.47 TW.h
72.2 %
74.5 %
27.8 %
69.6 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1999 Data from a trial operation not provided
2000 5121.760 1450 4638
2001 9055.420 1450 6555
2002 7491.290 1495 6080 85.8 91.9 91.9 70.3 70.3
2003 9084.750 1495 6542 74.7 70.4 79.0 69.4 69.8
2004 11698.640 1495 8042 91.6 89.6 83.0 89.1 77.0
2005 9621.390 1495 6748 77.0 73.5 80.4 73.5 76.0
2006 11140.100 1495 7811 89.2 89.8 82.4 85.1 78.0
2007 9973.850 1495 7141 81.5 80.2 82.0 76.2 77.6
2008 11321.500 1495 8085 92.0 89.0 83.1 86.2 78.9
2009 10293.330 1495 7219 82.4 80.1 82.7 78.6 78.9
2010 11094.030 1495 7743 88.4 86.1 83.1 84.7 79.6
2011 10640.600 1495 7717 88.1 86.6 83.4 81.2 79.7
2012 4561.720 1495 3228 36.8 35.3 78.9 34.7 75.5
2013 10581.570 1495 7344 83.8 82.7 79.2 80.8 76.0
2014 10918.200 1495 8091 92.4 95.4 80.5 83.4 76.6
2015 8920.040 1495 6332 72.3 69.4 79.7 68.1 75.9
2016 8169.290 1495 5944 67.7 64.0 78.6 62.2 75.0
2017 11390.130 1495 7884 90.0 87.6 79.2 87.0 75.8
2018 8867.460 1495 6063 69.2 67.9 78.5 67.7 75.3
2019 10630.330 1495 7243 82.7 82.4 78.8 81.2 75.6
2020 9482.620 1495 8184 93.2 72.3 78.4 72.2 75.4
2021 4424.470 1495 3077 35.1 33.7 76.1 33.8 73.3
2022 0.000 1495 0 0.0 0.0 72.4 0.0 69.8
2023 8513.710 1495 6021 68.7 67.3 72.2 65.0 69.6
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-09-18