Skip to content
Skip to navigation
Contact Us
IAEA.org
NUCLEUS
World Statistics
Country Statistics
Publications
Glossary
About PRIS
CIVAUX-2
Operational
Reactor Details
Reactor Type
Model
Owner
Operator
PWR
N4 REP 1450
ÉLECTRICITÉ DE FRANCE
ÉLECTRICITÉ DE FRANCE
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
1495
MW
e
1450
MW
e
1561
MW
e
4270
MW
t
Construction Start Date
First Criticality Date
01 Apr, 1991
27 Nov, 1999
First Grid Connection
Commercial Operation Date
24 Dec, 1999
23 Apr, 2002
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
214.47 TW.h
72.2 %
74.5 %
27.8 %
69.6 %
Lifetime performance calculated up to year
2023
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
1999
Data from a trial operation not provided
2000
5121.760
1450
4638
2001
9055.420
1450
6555
2002
7491.290
1495
6080
85.8
91.9
91.9
70.3
70.3
2003
9084.750
1495
6542
74.7
70.4
79.0
69.4
69.8
2004
11698.640
1495
8042
91.6
89.6
83.0
89.1
77.0
2005
9621.390
1495
6748
77.0
73.5
80.4
73.5
76.0
2006
11140.100
1495
7811
89.2
89.8
82.4
85.1
78.0
2007
9973.850
1495
7141
81.5
80.2
82.0
76.2
77.6
2008
11321.500
1495
8085
92.0
89.0
83.1
86.2
78.9
2009
10293.330
1495
7219
82.4
80.1
82.7
78.6
78.9
2010
11094.030
1495
7743
88.4
86.1
83.1
84.7
79.6
2011
10640.600
1495
7717
88.1
86.6
83.4
81.2
79.7
2012
4561.720
1495
3228
36.8
35.3
78.9
34.7
75.5
2013
10581.570
1495
7344
83.8
82.7
79.2
80.8
76.0
2014
10918.200
1495
8091
92.4
95.4
80.5
83.4
76.6
2015
8920.040
1495
6332
72.3
69.4
79.7
68.1
75.9
2016
8169.290
1495
5944
67.7
64.0
78.6
62.2
75.0
2017
11390.130
1495
7884
90.0
87.6
79.2
87.0
75.8
2018
8867.460
1495
6063
69.2
67.9
78.5
67.7
75.3
2019
10630.330
1495
7243
82.7
82.4
78.8
81.2
75.6
2020
9482.620
1495
8184
93.2
72.3
78.4
72.2
75.4
2021
4424.470
1495
3077
35.1
33.7
76.1
33.8
73.3
2022
0.000
1495
0
0.0
0.0
72.4
0.0
69.8
2023
8513.710
1495
6021
68.7
67.3
72.2
65.0
69.6
Performance indicators are calculated from the Commercial Operation Date.
Above data generated by the PRIS database. Last update on 2024-09-18
Previous
(CIVAUX-1)
(CRUAS-1)
Next
FRANCE
BELLEVILLE-1
BELLEVILLE-2
BLAYAIS-1
BLAYAIS-2
BLAYAIS-3
BLAYAIS-4
BUGEY-1
BUGEY-2
BUGEY-3
BUGEY-4
BUGEY-5
CATTENOM-1
CATTENOM-2
CATTENOM-3
CATTENOM-4
CHINON A-1
CHINON A-2
CHINON A-3
CHINON B-1
CHINON B-2
CHINON B-3
CHINON B-4
CHOOZ B-1
CHOOZ B-2
CHOOZ-A (ARDENNES)
CIVAUX-1
CIVAUX-2
CRUAS-1
CRUAS-2
CRUAS-3
CRUAS-4
DAMPIERRE-1
DAMPIERRE-2
DAMPIERRE-3
DAMPIERRE-4
EL-4 (MONTS D'ARREE)
FESSENHEIM-1
FESSENHEIM-2
FLAMANVILLE-1
FLAMANVILLE-2
FLAMANVILLE-3
G-2 (MARCOULE)
G-3 (MARCOULE)
GOLFECH-1
GOLFECH-2
GRAVELINES-1
GRAVELINES-2
GRAVELINES-3
GRAVELINES-4
GRAVELINES-5
GRAVELINES-6
NOGENT-1
NOGENT-2
PALUEL-1
PALUEL-2
PALUEL-3
PALUEL-4
PENLY-1
PENLY-2
PHENIX
ST. ALBAN-1
ST. ALBAN-2
ST. LAURENT A-1
ST. LAURENT A-2
ST. LAURENT B-1
ST. LAURENT B-2
SUPER-PHENIX
TRICASTIN-1
TRICASTIN-2
TRICASTIN-3
TRICASTIN-4