CIVAUX-1

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
N4 REP 1450
ÉLECTRICITÉ DE FRANCE
ÉLECTRICITÉ DE FRANCE
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1495 MWe
1450 MWe
1561 MWe
4270 MWt
Construction Start Date First Criticality Date
15 Oct, 1988
29 Nov, 1997
First Grid Connection Commercial Operation Date
24 Dec, 1997
29 Jan, 2002

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
216.85 TW.h
72.3 %
74.5 %
27.7 %
70.4 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1997 Data from a trial operation not provided
1998 "
1999 2916.840 1450 2608
2000 8859.030 1450 7133
2001 2026.820 1450 1667
2002 9544.100 1495 7331 84.8 82.6 82.6 74.7 74.7
2003 10932.080 1495 7438 84.9 83.1 82.8 83.5 79.3
2004 11276.480 1495 7816 89.0 86.9 84.2 85.9 81.6
2005 9672.340 1495 6855 78.2 73.8 81.6 73.8 79.6
2006 10318.210 1495 7189 82.1 79.3 81.1 78.8 79.4
2007 9031.530 1495 6242 71.2 69.4 79.1 69.0 77.6
2008 9872.980 1495 6967 79.3 76.0 78.7 75.2 77.3
2009 9494.390 1495 6852 78.2 73.4 78.0 72.5 76.7
2010 10590.110 1495 7582 86.6 81.4 78.4 80.9 77.2
2011 8663.880 1495 6006 68.6 67.2 77.3 66.2 76.0
2012 11583.200 1495 8487 96.6 96.4 79.0 88.2 77.2
2013 7637.260 1495 5425 61.9 58.9 77.3 58.3 75.6
2014 8649.460 1495 5902 67.4 66.3 76.5 66.0 74.8
2015 11646.170 1495 8359 95.4 94.7 77.8 88.9 75.9
2016 9873.520 1495 7010 79.8 75.7 77.6 75.2 75.8
2017 7559.810 1495 5263 60.1 57.7 76.4 57.7 74.7
2018 10636.190 1495 7321 83.6 82.3 76.8 81.2 75.1
2019 11608.530 1495 8247 94.1 94.1 77.7 88.6 75.8
2020 5723.660 1495 4025 45.8 43.7 75.9 43.6 74.1
2021 7952.740 1495 5519 63.0 62.0 75.2 60.7 73.4
2022 0.000 1495 0 0.0 0.0 71.6 0.0 69.9
2023 10575.260 1495 7878 89.9 86.1 72.3 80.8 70.4
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-10-03


Previous  (CHOOZ-A (ARDENNES)) (CIVAUX-2)  Next