PENLY-2

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
P4 REP 1300
ÉLECTRICITÉ DE FRANCE
ÉLECTRICITÉ DE FRANCE
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1330 MWe
1330 MWe
1382 MWe
3817 MWt
Construction Start Date First Criticality Date
01 Aug, 1984
10 Jan, 1992
First Grid Connection Commercial Operation Date
04 Feb, 1992
01 Nov, 1992

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
276.23 TW.h
80.7 %
82.4 %
19.3 %
75.1 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1992 5149.770 1330 4796 100.0 100.0 100.0 101.2 101.2
1993 8611.760 1330 6658 76.0 74.4 78.1 73.9 77.8
1994 8759.660 1330 7228 82.5 77.6 77.8 75.2 76.6
1995 8169.730 1330 6574 75.0 73.8 76.6 70.1 74.6
1996 9757.970 1330 8025 91.4 89.3 79.6 83.5 76.7
1997 8068.940 1330 7186 82.0 83.0 80.3 69.3 75.3
1998 8877.520 1330 7318 83.5 81.1 80.4 76.2 75.4
1999 8636.970 1330 7203 82.2 79.4 80.2 74.1 75.2
2000 9584.470 1330 8393 95.6 96.8 82.3 82.0 76.1
2001 8816.230 1330 7333 83.7 80.2 82.1 75.7 76.0
2002 8464.260 1330 6890 78.6 79.0 81.8 72.6 75.7
2003 10207.810 1330 8603 98.2 97.6 83.2 87.6 76.8
2004 7225.850 1330 6231 70.9 69.1 82.0 61.8 75.5
2005 9102.590 1330 7546 86.1 84.0 82.2 78.1 75.7
2006 9885.160 1330 8447 96.4 97.0 83.2 84.8 76.4
2007 8718.650 1330 7081 80.8 76.7 82.8 74.8 76.3
2008 9474.850 1330 7590 86.4 85.0 82.9 81.1 76.6
2009 8954.230 1330 7258 82.8 80.3 82.8 76.9 76.6
2010 9986.960 1330 8571 97.8 96.5 83.5 85.7 77.1
2011 9873.060 1330 7931 90.5 87.2 83.7 84.7 77.5
2012 7151.260 1330 5802 66.0 65.3 82.8 61.2 76.7
2013 10253.290 1330 8413 96.0 92.6 83.3 88.0 77.2
2014 7123.770 1330 5722 65.3 62.9 82.4 61.1 76.5
2015 9204.630 1330 7743 88.4 87.1 82.6 79.0 76.6
2016 8682.340 1330 6925 78.8 76.2 82.3 74.3 76.5
2017 10308.820 1330 8697 99.3 98.3 82.9 88.5 77.0
2018 8627.090 1330 7065 80.6 77.8 82.7 74.0 76.9
2019 6201.080 1330 4943 56.4 55.6 81.7 53.2 76.0
2020 10224.760 1330 8609 98.0 96.4 82.3 87.5 76.4
2021 9455.830 1330 7694 87.8 86.1 82.4 81.2 76.6
2022 6747.560 1330 5359 61.2 60.1 81.6 57.9 76.0
2023 5763.760 1330 4733 54.0 51.3 80.7 49.5 75.1
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-09-10