EL-4 (MONTS D'ARREE)

Permanent Shutdown


Reactor Details

Reactor Type Model Owner Operator
HWGCR
MONTS-D'ARREE
ÉLECTRICITÉ DE FRANCE
ÉLECTRICITÉ DE FRANCE
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
70 MWe
70 MWe
75 MWe
250 MWt
Construction Start Date First Criticality Date
01 Jul, 1962
23 Dec, 1966
First Grid Connection Commercial Operation Date
09 Jul, 1967
01 Jun, 1968
Permanent Shutdown Date
31 Jul, 1985

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
6.32 TW.h
70.8 %
75.4 %
29.2 %
68.7 %
Lifetime performance calculated up to year 1985

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1967 Data from a trial operation not provided
1968 Data Not Provided
1969 "
1970 "
1971 176.300 77 3374 38.5 38.5 NC 26.1 NC
1972 512.800 75 7106 80.9 80.8 NC 77.8 NC
1973 428.500 70 6338 72.4 72.0 63.4 69.9 57.4
1974 550.800 70 8158 93.1 90.9 70.0 89.8 65.2
1975 425.200 70 7661 87.4 78.3 71.6 69.3 66.0
1976 517.900 70 7705 87.7 84.7 73.7 84.2 69.0
1977 478.600 70 7027 80.2 78.4 74.4 78.0 70.2
1978 525.700 70 7542 86.1 84.8 75.6 85.7 72.1
1979 540.000 70 7938 90.6 90.8 77.3 88.1 73.8
1980 523.000 70 7620 86.8 85.1 78.1 85.1 75.0
1981 349.000 70 5166 59.0 57.9 76.3 56.9 73.3
1982 373.000 70 5577 63.7 61.2 75.0 60.8 72.3
1983 222.000 70 4807 54.9 36.4 72.1 36.2 69.6
1984 358.000 70 6202 70.6 55.6 70.9 58.2 68.8
1985 239.400 70 4107 80.7 67.8 70.8 67.2 68.7
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS


Above data generated by the PRIS database. Last update on 2024-10-03