CRUAS-2
Operational
Reactor Details
Reactor Type
Model
Owner
Operator
PWR
CP2
ÉLECTRICITÉ DE FRANCE
ÉLECTRICITÉ DE FRANCE
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
915
MW
e
915
MW
e
956
MW
e
2785
MW
t
Construction Start Date
First Criticality Date
15 Nov, 1978
01 Aug, 1984
First Grid Connection
Commercial Operation Date
06 Sep, 1984
01 Apr, 1985
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
226.52 TW.h
76.6 %
79.4 %
23.4 %
72.5 %
Lifetime performance calculated up to year
2023
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
1984
146.000
880
651
1985
6103.200
880
8330
97.3
96.0
96.0
83.4
83.4
1986
4955.000
880
6258
71.4
70.1
81.2
64.3
72.5
1987
5559.900
900
6761
77.2
79.1
80.4
70.5
71.8
1988
5698.000
915
7176
81.7
80.6
80.5
70.9
71.5
1989
6298.510
915
7697
87.9
83.3
81.1
78.6
73.0
1990
6001.780
915
7114
81.2
77.7
80.5
74.9
73.4
1991
4099.880
915
4838
55.2
53.8
76.5
51.2
70.0
1992
5946.870
915
6910
78.7
77.0
76.5
74.0
70.6
1993
5441.040
915
6463
73.8
73.5
76.2
67.9
70.2
1994
5566.060
915
6765
77.2
94.1
78.0
69.4
70.2
1995
5366.770
915
6581
75.1
72.4
77.5
67.0
69.9
1996
6521.860
915
7870
89.6
87.1
78.3
81.1
70.8
1997
5176.080
915
6596
75.3
76.5
78.2
64.6
70.3
1998
6003.570
915
7396
84.4
79.0
78.2
74.9
70.7
1999
6393.810
915
7787
88.9
85.3
78.7
79.8
71.3
2000
6420.910
915
7755
88.3
85.6
79.2
79.9
71.8
2001
5914.400
915
7053
80.5
76.5
79.0
73.8
72.0
2002
6547.440
915
7776
88.8
86.0
79.4
81.7
72.5
2003
5727.930
915
6927
79.1
75.6
79.2
71.5
72.4
2004
6612.960
915
7661
87.2
84.9
79.5
82.3
73.0
2005
6504.120
915
7684
87.7
83.0
79.7
81.1
73.4
2006
6509.490
915
7736
88.3
84.3
79.9
81.2
73.7
2007
4617.900
915
5602
64.0
58.0
78.9
57.6
73.0
2008
5597.430
915
6633
75.5
69.8
78.5
69.6
72.9
2009
5862.160
915
6886
78.6
73.6
78.3
73.1
72.9
2010
5305.440
915
6036
68.9
66.6
77.9
66.2
72.6
2011
5791.150
915
6577
75.1
73.0
77.7
72.2
72.6
2012
6761.590
915
7665
87.3
84.7
77.9
84.1
73.0
2013
5729.400
915
6729
76.8
73.0
77.8
71.5
73.0
2014
6708.450
915
7931
90.5
86.2
78.0
83.7
73.3
2015
5568.660
915
6630
75.7
70.2
77.8
69.5
73.2
2016
6596.100
915
7743
88.2
83.1
78.0
82.1
73.5
2017
6505.000
915
7739
88.3
84.0
78.2
81.2
73.7
2018
4984.840
915
5958
68.0
64.4
77.7
62.2
73.4
2019
4872.150
915
6038
68.9
65.1
77.4
60.8
73.0
2020
5761.690
915
6924
78.8
74.5
77.3
71.7
73.0
2021
5251.280
915
6401
73.1
67.9
77.0
65.5
72.8
2022
5384.340
915
6707
76.6
69.6
76.8
67.2
72.6
2023
5425.630
915
6336
72.3
69.2
76.6
67.7
72.5
Performance indicators are calculated from the Commercial Operation Date.
Above data generated by the PRIS database. Last update on 2024-12-04
Previous
(CRUAS-1)
(CRUAS-3)
Next
FRANCE
BELLEVILLE-1
BELLEVILLE-2
BLAYAIS-1
BLAYAIS-2
BLAYAIS-3
BLAYAIS-4
BUGEY-1
BUGEY-2
BUGEY-3
BUGEY-4
BUGEY-5
CATTENOM-1
CATTENOM-2
CATTENOM-3
CATTENOM-4
CHINON A-1
CHINON A-2
CHINON A-3
CHINON B-1
CHINON B-2
CHINON B-3
CHINON B-4
CHOOZ B-1
CHOOZ B-2
CHOOZ-A (ARDENNES)
CIVAUX-1
CIVAUX-2
CRUAS-1
CRUAS-2
CRUAS-3
CRUAS-4
DAMPIERRE-1
DAMPIERRE-2
DAMPIERRE-3
DAMPIERRE-4
EL-4 (MONTS D'ARREE)
FESSENHEIM-1
FESSENHEIM-2
FLAMANVILLE-1
FLAMANVILLE-2
FLAMANVILLE-3
G-2 (MARCOULE)
G-3 (MARCOULE)
GOLFECH-1
GOLFECH-2
GRAVELINES-1
GRAVELINES-2
GRAVELINES-3
GRAVELINES-4
GRAVELINES-5
GRAVELINES-6
NOGENT-1
NOGENT-2
PALUEL-1
PALUEL-2
PALUEL-3
PALUEL-4
PENLY-1
PENLY-2
PHENIX
ST. ALBAN-1
ST. ALBAN-2
ST. LAURENT A-1
ST. LAURENT A-2
ST. LAURENT B-1
ST. LAURENT B-2
SUPER-PHENIX
TRICASTIN-1
TRICASTIN-2
TRICASTIN-3
TRICASTIN-4