CHINON A-2

Permanent Shutdown


Reactor Details

Reactor Type Model Owner Operator
GCR
UNGG
ÉLECTRICITÉ DE FRANCE
ÉLECTRICITÉ DE FRANCE
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
180 MWe
170 MWe
230 MWe
800 MWt
Construction Start Date First Criticality Date
01 Aug, 1959
17 Aug, 1964
First Grid Connection Commercial Operation Date
24 Feb, 1965
24 Feb, 1965
Permanent Shutdown Date
14 Jun, 1985

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
24.88 TW.h
71.0 %
75.0 %
29.0 %
71.1 %
Lifetime performance calculated up to year 1985

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1965 Data Not Provided
1966 "
1967 "
1968 "
1969 "
1970 1704.000 230 7863 89.8 84.2 NC 84.6 NC
1971 1162.500 230 5002 57.1 56.4 NC 57.7 NC
1972 1596.000 230 6844 77.9 76.9 NC 79.0 NC
1973 1451.500 210 7089 80.9 78.9 NC 78.9 NC
1974 1431.200 210 7047 80.4 77.8 74.7 77.8 75.5
1975 1271.900 210 6396 73.0 69.1 73.8 69.1 74.5
1976 925.400 210 5339 60.8 50.3 70.6 50.2 71.1
1977 819.100 210 4680 53.4 45.4 67.6 44.5 67.9
1978 1055.300 210 5849 66.8 57.5 66.5 57.4 66.8
1979 657.000 210 3666 41.8 41.0 64.0 35.7 63.8
1980 1261.000 180 7074 80.5 79.2 65.2 79.8 65.0
1981 1269.900 180 7131 81.4 80.6 66.3 80.5 66.1
1982 1416.600 180 7995 91.3 90.2 67.9 89.8 67.7
1983 1340.000 180 7415 84.6 83.6 68.8 85.0 68.8
1984 1510.000 180 8371 95.3 94.4 70.4 95.5 70.4
1985 710.000 180 3919 100.0 99.6 71.0 100.9 71.1
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS


Above data generated by the PRIS database. Last update on 2024-11-03