SUPER-PHENIX

Permanent Shutdown


Reactor Details

Reactor Type Model Owner Operator
FBR
Na-1200
ÉLECTRICITÉ DE FRANCE
ÉLECTRICITÉ DE FRANCE
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1200 MWe
1200 MWe
1242 MWe
3000 MWt
Construction Start Date First Criticality Date
13 Dec, 1976
07 Sep, 1985
First Grid Connection Commercial Operation Date
14 Jan, 1986
01 Dec, 1986
Permanent Shutdown Date
31 Dec, 1998

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
3.39 TW.h
9.2 %
14.4 %
90.8 %
7.9 %
Lifetime performance calculated up to year 1996

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1986 928.700 1200 2625 24.3 16.6 16.6 15.6 15.6
1987 812.100 1200 1489 17.0 8.4 9.0 7.7 8.4
1988 0.000 1200 0 0.0 0.0 4.7 0.0 4.3
1989 1756.440 1200 2202 25.1 17.4 8.8 16.7 8.3
1990 588.340 1200 595 6.8 14.2 10.1 5.6 7.7
1991 0.000 1200 0 0.0 0.0 8.2 0.0 6.2
1992 0.000 1200 0 0.0 0.0 6.8 0.0 5.2
1993 Data Not Provided
1994 7.520 1200 58 0.7 0.1 5.9 0.1 4.4
1995 Data Not Provided
1996 3391.610 1200 5692 64.8 32.6 9.2 32.2 7.9
1997 Data Not Provided
1998 "
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-09-10