LOVIISA-2
Operational
Reactor Details
Reactor Type
|
Model
|
Owner
|
Operator
|
PWR
|
VVER V-213
|
FORTUM POWER AND HEAT OY (former IVO)
|
FORTUM POWER AND HEAT OY (former IVO)
|
Reference Unit Power (Net Capacity)
|
Design Net Capacity
|
Gross Capacity
|
Thermal Capacity
|
507
MWe
|
420
MWe
|
531
MWe
|
1500
MWt
|
Construction Start Date
|
First Criticality Date
|
|
|
01 Aug, 1972
|
17 Oct, 1980
|
|
|
First Grid Connection
|
Commercial Operation Date
|
|
|
04 Nov, 1980
|
05 Jan, 1981
|
|
|
|
|
LifeTime Performance
Electricity Supplied
|
Energy Availability Factor
|
Operation Factor
|
Energy Unavailability Factor
|
Load Factor
|
152.29 TW.h
|
89.5 %
|
91.3 %
|
10.5 %
|
89.4 %
|
Lifetime performance calculated up to year
2021
Operating History
Year
|
Electricity Supplied
[GW.h]
|
Reference Unit Power
[MW]
|
Annual Time On Line
[h]
|
Operation Factor
[%]
|
Energy Availability Factor
[%]
|
Load Factor
[%]
|
Annual
|
Cumulative
|
Annual
|
Cumulative
|
1980
|
321.600
|
445
|
1268
|
|
|
|
|
|
1981
|
2714.200
|
440
|
7062
|
80.6
|
72.2
|
72.2
|
70.4
|
70.4
|
1982
|
2997.400
|
440
|
7046
|
80.4
|
78.0
|
75.1
|
77.8
|
74.1
|
1983
|
3474.500
|
445
|
8063
|
92.0
|
90.1
|
80.1
|
89.1
|
79.1
|
1984
|
3608.630
|
445
|
8251
|
93.9
|
92.6
|
83.3
|
92.3
|
82.5
|
1985
|
3549.840
|
440
|
8162
|
93.2
|
92.2
|
85.0
|
92.1
|
84.4
|
1986
|
3174.870
|
445
|
7273
|
83.0
|
81.5
|
84.4
|
81.4
|
83.9
|
1987
|
3572.080
|
445
|
8242
|
94.1
|
93.4
|
85.7
|
91.6
|
85.0
|
1988
|
3602.270
|
445
|
8305
|
94.6
|
94.7
|
86.8
|
92.2
|
85.9
|
1989
|
3550.960
|
445
|
8128
|
92.8
|
91.7
|
87.4
|
91.1
|
86.5
|
1990
|
3251.050
|
445
|
7584
|
86.6
|
85.3
|
87.2
|
83.4
|
86.2
|
1991
|
3442.190
|
445
|
7941
|
90.6
|
89.0
|
87.3
|
88.3
|
86.4
|
1992
|
3468.450
|
445
|
7931
|
90.3
|
89.1
|
87.5
|
88.7
|
86.6
|
1993
|
3550.790
|
445
|
8050
|
92.0
|
91.2
|
87.8
|
91.2
|
86.9
|
1994
|
3124.710
|
445
|
7170
|
81.8
|
80.5
|
87.2
|
80.2
|
86.4
|
1995
|
3060.250
|
445
|
7064
|
80.6
|
77.6
|
86.6
|
78.5
|
85.9
|
1996
|
3621.330
|
445
|
8227
|
93.7
|
92.7
|
87.0
|
92.6
|
86.3
|
1997
|
3804.700
|
445
|
8267
|
94.4
|
92.0
|
87.3
|
97.6
|
87.0
|
1998
|
3687.900
|
488
|
7892
|
90.1
|
86.4
|
87.2
|
86.3
|
87.0
|
1999
|
3974.340
|
488
|
8281
|
94.5
|
93.5
|
87.6
|
93.0
|
87.3
|
2000
|
3885.100
|
488
|
8314
|
94.6
|
90.9
|
87.8
|
90.6
|
87.5
|
2001
|
3781.060
|
488
|
8149
|
93.0
|
89.6
|
87.9
|
88.4
|
87.5
|
2002
|
3498.660
|
488
|
7463
|
85.2
|
82.6
|
87.6
|
81.8
|
87.2
|
2003
|
3736.650
|
488
|
8358
|
95.4
|
90.0
|
87.7
|
87.4
|
87.2
|
2004
|
4009.180
|
488
|
8231
|
93.7
|
93.1
|
88.0
|
93.5
|
87.5
|
2005
|
4076.120
|
488
|
8376
|
95.6
|
94.6
|
88.2
|
95.4
|
87.9
|
2006
|
3766.550
|
488
|
7863
|
89.8
|
87.5
|
88.2
|
88.1
|
87.9
|
2007
|
4090.870
|
488
|
8403
|
95.9
|
94.8
|
88.5
|
95.7
|
88.2
|
2008
|
3997.950
|
488
|
8240
|
93.8
|
92.5
|
88.6
|
93.3
|
88.4
|
2009
|
4063.830
|
488
|
8318
|
95.0
|
94.3
|
88.8
|
95.1
|
88.6
|
2010
|
3789.140
|
488
|
7797
|
89.0
|
88.1
|
88.8
|
88.6
|
88.6
|
2011
|
4035.300
|
488
|
8290
|
94.6
|
93.7
|
89.0
|
94.4
|
88.8
|
2012
|
3959.190
|
496
|
8141
|
92.7
|
91.0
|
89.0
|
90.9
|
88.9
|
2013
|
4040.040
|
496
|
8250
|
94.2
|
92.4
|
89.1
|
93.0
|
89.0
|
2014
|
3872.750
|
496
|
7912
|
90.3
|
88.9
|
89.1
|
89.1
|
89.0
|
2015
|
4039.110
|
496
|
8276
|
94.5
|
92.6
|
89.2
|
93.0
|
89.1
|
2016
|
4068.960
|
502
|
8304
|
94.5
|
92.9
|
89.4
|
93.3
|
89.3
|
2017
|
4071.920
|
502
|
8255
|
94.2
|
92.5
|
89.4
|
92.6
|
89.4
|
2018
|
3770.710
|
507
|
7639
|
87.2
|
85.5
|
89.3
|
85.6
|
89.2
|
2019
|
4053.970
|
507
|
8142
|
93.0
|
91.6
|
89.4
|
91.3
|
89.3
|
2020
|
4058.510
|
507
|
8171
|
93.0
|
91.2
|
89.4
|
91.1
|
89.4
|
2021
|
4071.020
|
507
|
8170
|
93.3
|
91.8
|
89.5
|
91.7
|
89.4
|
Performance indicators are calculated from the Commercial Operation Date.
Above data generated by the PRIS database. Last update on 2023-03-27