ALMARAZ-1

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
WH 3LP
Iberdrola, Endesa, Gas Natural
CENTRALES NUCLEARES ALMARAZ-TRILLO (ID/UFG/ENDESA/HC/NUCLENOR)
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1011 MWe
900 MWe
1049 MWe
2947 MWt
Construction Start Date First Criticality Date
03 Jul, 1973
05 Apr, 1981
First Grid Connection Commercial Operation Date
01 May, 1981
01 Sep, 1983

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
295.37 TW.h
86.3 %
88.8 %
13.7 %
86.3 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1981 1888.900 930 3119
1982 2322.600 930 5864
1983 3713.900 930 5925 88.7 78.4 78.4 78.4 78.4
1984 4820.500 893 6062 69.0 65.0 68.5 61.4 65.8
1985 4825.170 900 5705 65.1 61.6 65.6 61.2 63.8
1986 5425.020 900 6418 73.3 69.3 66.7 68.8 65.3
1987 7193.690 900 8346 95.3 92.5 72.6 91.2 71.3
1988 5879.590 900 6899 78.5 74.6 73.0 74.4 71.9
1989 6562.180 895 7640 87.2 83.2 74.6 83.7 73.7
1990 6460.660 895 7451 85.1 82.2 75.6 82.4 74.9
1991 7481.710 895 8589 98.0 96.2 78.1 95.4 77.4
1992 6379.060 895 7387 84.1 80.8 78.4 81.1 77.8
1993 6530.850 895 7663 87.5 83.2 78.8 83.3 78.3
1994 7448.600 895 8495 97.0 95.0 80.3 95.0 79.8
1995 6588.460 895 7709 88.0 83.7 80.6 84.0 80.1
1996 5904.300 895 6789 77.3 72.5 79.9 75.1 79.7
1997 6642.830 895 7371 84.1 79.6 79.9 84.7 80.1
1998 8032.460 944 8760 100.0 97.1 81.1 97.1 81.2
1999 6988.630 927 7613 86.9 84.7 81.3 86.1 81.6
2000 7471.570 927 8014 91.2 90.3 81.8 91.8 82.2
2001 8151.390 927 8749 99.9 99.0 82.8 100.4 83.2
2002 7427.990 944 8100 92.5 90.4 83.2 89.8 83.5
2003 7499.110 944 8233 94.0 91.6 83.6 90.7 83.9
2004 8185.690 944 8784 100.0 99.2 84.4 98.7 84.6
2005 7519.430 944 8180 93.4 91.4 84.7 90.9 84.9
2006 7152.420 944 7831 89.4 86.5 84.8 86.5 85.0
2007 8189.800 944 8760 100.0 99.0 85.4 99.0 85.6
2008 7190.760 944 7725 87.9 86.6 85.5 86.7 85.6
2009 6880.100 944 7336 83.7 82.8 85.4 83.2 85.5
2010 7884.250 1008 8147 93.0 89.7 85.5 89.7 85.7
2011 7519.490 1011 7814 89.2 84.9 85.5 84.9 85.7
2012 7346.070 1004 7405 84.3 85.0 85.5 83.3 85.6
2013 7695.840 1011 7882 90.0 87.1 85.6 86.9 85.6
2014 7252.450 1011 7351 83.9 81.9 85.4 81.9 85.5
2015 8438.610 1011 8613 98.3 95.3 85.8 95.3 85.8
2016 7447.790 1011 7622 86.8 84.1 85.7 83.9 85.8
2017 7753.930 1011 7885 90.0 87.6 85.8 87.6 85.8
2018 7844.020 1011 7934 90.6 88.7 85.8 88.6 85.9
2019 8662.820 1011 8760 100.0 98.0 86.2 97.8 86.2
2020 6913.130 1011 7065 80.4 77.5 86.0 77.8 86.0
2021 7695.620 1011 7800 89.0 87.2 86.0 86.9 86.0
2022 8427.990 1011 8564 97.8 95.2 86.2 95.2 86.3
2023 7735.090 1011 7948 90.7 88.6 86.3 87.3 86.3
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-09-18