VANDELLOS-1

Permanent Shutdown


Reactor Details

Reactor Type Model Owner Operator
GCR
HISPANO-FRANCESA DE ENERGIA NUCLEAR, S.A.
HISPANO-FRANCESA DE ENERGIA NUCLEAR, S.A.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
480 MWe
480 MWe
500 MWe
1670 MWt
Construction Start Date First Criticality Date
21 Jun, 1968
11 Feb, 1972
First Grid Connection Commercial Operation Date
06 May, 1972
02 Aug, 1972
Permanent Shutdown Date
31 Jul, 1990

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
53.63 TW.h
72.3 %
86.0 %
27.7 %
70.4 %
Lifetime performance calculated up to year 1990

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1972 1138.000 480 4216 59.9 100.0 100.0 44.6 44.6
1973 3042.100 480 7239 82.6 72.3 80.5 72.4 64.2
1974 3643.200 480 7982 91.1 86.6 83.0 86.6 73.4
1975 3384.800 480 7602 86.8 80.5 82.3 80.5 75.5
1976 3203.000 480 7961 90.6 79.2 81.6 76.0 75.6
1977 3288.200 480 8313 94.9 78.2 81.0 78.2 76.1
1978 3180.000 480 7989 91.2 75.6 80.1 75.6 76.0
1979 3099.500 480 8092 92.4 73.8 79.3 73.7 75.7
1980 3283.300 480 8269 94.1 77.8 79.1 77.9 76.0
1981 2955.200 480 7719 88.1 70.3 78.2 70.3 75.4
1982 3059.000 480 7985 91.2 72.8 77.6 72.8 75.1
1983 3029.800 480 7934 90.6 72.1 77.2 72.1 74.8
1984 2888.430 480 7890 89.8 68.5 76.5 68.5 74.3
1985 2927.580 480 7972 91.0 69.6 76.0 69.6 74.0
1986 2964.600 480 7998 91.3 70.5 75.6 70.5 73.7
1987 3030.000 480 8103 92.5 72.1 75.4 72.1 73.6
1988 3058.100 480 8049 91.6 72.5 75.2 72.5 73.6
1989 2454.300 480 6349 72.5 66.9 74.7 58.4 72.7
1990 0.000 480 0 0.0 0.0 72.3 0.0 70.4
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-09-18


Previous  (TRILLO-1) (VANDELLOS-2)  Next