TRILLO-1
Operational
Reactor Details
Reactor Type
Model
Owner
Operator
PWR
PWR 3 loops
Iberdrola, Gas Natural, Hidroeléctrica del Cantábrico, Nuclenor
CENTRALES NUCLEARES ALMARAZ-TRILLO (ID/UFG/ENDESA/HC/NUCLENOR)
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
1003
MW
e
990
MW
e
1066
MW
e
3010
MW
t
Construction Start Date
First Criticality Date
17 Aug, 1979
14 May, 1988
First Grid Connection
Commercial Operation Date
23 May, 1988
06 Aug, 1988
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
269.99 TW.h
87.3 %
88.8 %
12.7 %
86.9 %
Lifetime performance calculated up to year
2023
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
1988
2896.230
990
3511
72.1
72.7
72.7
66.3
66.3
1989
7147.790
974
7665
87.5
83.8
80.4
83.8
78.5
1990
6372.440
974
7170
81.8
74.7
78.1
74.7
77.0
1991
6481.540
974
6891
78.7
76.0
77.5
76.0
76.7
1992
7938.460
1000
8028
91.4
90.4
80.4
90.4
79.8
1993
7395.860
1000
7512
85.8
84.4
81.2
84.4
80.7
1994
7927.690
1000
8009
91.4
91.0
82.7
90.5
82.2
1995
7472.620
1000
7597
86.7
85.8
83.2
85.3
82.6
1996
7626.310
1000
7713
87.8
87.3
83.6
86.8
83.2
1997
7765.450
1000
8066
92.1
89.3
84.3
88.6
83.7
1998
6589.730
1000
6686
76.3
75.8
83.4
75.2
82.9
1999
6828.820
1000
6876
78.5
78.0
83.0
78.0
82.5
2000
8206.490
1000
8251
93.9
93.6
83.8
93.4
83.4
2001
7907.410
1000
7966
90.9
90.6
84.3
90.3
83.9
2002
7827.000
1000
7876
89.9
89.6
84.7
89.3
84.3
2003
8114.660
1003
8210
93.7
93.1
85.2
92.5
84.8
2004
7980.120
1003
8121
92.4
91.5
85.6
90.6
85.2
2005
8080.620
1003
8175
93.3
92.9
86.1
92.0
85.6
2006
7687.800
1003
7788
88.9
88.4
86.2
87.5
85.7
2007
7948.880
1003
8039
91.8
91.4
86.5
90.5
85.9
2008
7743.950
1003
7820
89.0
88.5
86.6
87.9
86.0
2009
7197.100
1003
7438
84.9
82.4
86.4
81.9
85.8
2010
7695.500
1003
7969
91.0
87.8
86.4
87.6
85.9
2011
7835.700
1003
7940
90.6
89.1
86.6
89.2
86.0
2012
7948.780
1003
8066
91.8
90.3
86.7
90.2
86.2
2013
7487.110
1003
7656
87.4
85.4
86.6
85.2
86.2
2014
7785.490
1003
7901
90.2
88.6
86.7
88.6
86.3
2015
7926.990
1003
8009
91.4
90.2
86.9
90.2
86.4
2016
8004.550
1003
8111
92.3
91.4
87.0
90.8
86.6
2017
7983.090
1003
8067
92.1
90.9
87.2
90.9
86.7
2018
7732.000
1003
7841
89.5
88.1
87.2
88.0
86.8
2019
7905.280
1003
8049
91.9
90.2
87.3
90.0
86.8
2020
7729.610
1003
7981
90.9
89.1
87.3
87.7
86.9
2021
7408.210
1003
7571
86.4
84.6
87.2
84.3
86.8
2022
7679.740
1003
7849
89.6
87.4
87.3
87.4
86.8
2023
7734.720
1003
8035
91.7
89.6
87.3
88.0
86.9
Performance indicators are calculated from the Commercial Operation Date.
Above data generated by the PRIS database. Last update on 2024-10-03
Previous
(SANTA MARIA DE GARONA)
(VANDELLOS-1)
Next
SPAIN
ALMARAZ-1
ALMARAZ-2
ASCO-1
ASCO-2
COFRENTES
JOSE CABRERA-1
SANTA MARIA DE GARONA
TRILLO-1
VANDELLOS-1
VANDELLOS-2