HDR GROSSWELZHEIM

Permanent Shutdown


Reactor Details

Reactor Type Model Owner Operator
BWR
Superheated steam reactor
HEISSDAMPFREAKTOR-BETRIEBSGESELLSCHAFT MBH.
HEISSDAMPFREAKTOR-BETRIEBSGESELLSCHAFT MBH.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
25 MWe
23 MWe
27 MWe
100 MWt
Construction Start Date First Criticality Date
01 Jan, 1965
14 Oct, 1969
First Grid Connection Commercial Operation Date
14 Oct, 1969
02 Aug, 1970
Permanent Shutdown Date
20 Apr, 1971

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
0.01 TW.h
NC
NC
NC
NC
Lifetime performance calculated up to year 1971

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1969 Data from a trial operation not provided
1970 Data Not Provided
1971 6.200 25 1222 42.4 8.6 NC 8.6 NC
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS


Above data are from the PRIS database. Last update on 2019-08-21