GREIFSWALD-5 (KGR 5)

Permanent Shutdown


Reactor Details

Reactor Type Model Owner Operator
PWR
VVER V-213
VEB KKW "Bruno Leuschner"
ENERGIEWERKE Nord GmbH
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
408 MWe
408 MWe
440 MWe
1375 MWt
Construction Start Date First Criticality Date
01 Dec, 1976
26 Mar, 1989
First Grid Connection Commercial Operation Date
24 Apr, 1989
01 Nov, 1989
Permanent Shutdown Date
24 Nov, 1989

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
NC
NC
NC
NC
NC
Lifetime performance calculated up to year 1989

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1989 Data Not Provided
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS


Above data generated by the PRIS database. Last update on 2024-12-04