GREIFSWALD-3 (KGR 3)

Permanent Shutdown


Reactor Details

Reactor Type Model Owner Operator
PWR
VVER V-230
ENERGIEWERKE Nord GmbH
ENERGIEWERKE Nord GmbH
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
408 MWe
408 MWe
440 MWe
1375 MWt
Construction Start Date First Criticality Date
01 Apr, 1972
16 Oct, 1977
First Grid Connection Commercial Operation Date
24 Oct, 1977
01 May, 1978
Permanent Shutdown Date
28 Feb, 1990

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
33.27 TW.h
NC
NC
NC
NC
Lifetime performance calculated up to year 1989

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1977 Data from a trial operation not provided
1978 Data Not Provided
1979 "
1980 "
1981 "
1982 "
1983 "
1984 "
1985 "
1986 "
1987 "
1988 "
1989 2783.690 408 7227 82.5 76.6 NC 77.9 NC
1990 Data Not Provided
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS


Above data generated by the PRIS database. Last update on 2024-09-18


Previous  (GREIFSWALD-2) (GREIFSWALD-4)  Next