CHASNUPP-5

Under Construction


Reactor Details

Reactor Type Model Owner Operator
PWR
Hualong-1
PAKISTAN ATOMIC ENERGY COMMISSION
PAKISTAN ATOMIC ENERGY COMMISSION
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1117 MWe
1117 MWe
1200 MWe
3180 MWt
Construction Start Date First Criticality Date
30 Dec, 2024
N/A
First Grid Connection Commercial Operation Date
N/A
N/A


Above data generated by the PRIS database. Last update on 2025-02-15


Previous  (CHASNUPP-4) (KANUPP-1)  Next