BREST-OD-300

Under Construction


Reactor Details

Reactor Type Model Owner Operator
FBR
BREST-OD-300
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
300 MWe
300 MWe
320 MWe
700 MWt
Construction Start Date First Criticality Date
08 Jun, 2021
N/A
First Grid Connection Commercial Operation Date
N/A
N/A


Above data generated by the PRIS database. Last update on 2024-12-04


Previous  (BILIBINO-4) (KALININ-1)  Next