KANUPP-2
(K-2)
Operational
Reactor Details
Reactor Type
Model
Owner
Operator
PWR
ACP-1000
PAKISTAN ATOMIC ENERGY COMMISSION
PAKISTAN ATOMIC ENERGY COMMISSION
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
1017
MW
e
1017
MW
e
1100
MW
e
3060
MW
t
Construction Start Date
First Criticality Date
20 Aug, 2015
28 Feb, 2021
First Grid Connection
Commercial Operation Date
18 Mar, 2021
21 May, 2021
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
18.59 TW.h
77.2 %
79.7 %
22.8 %
76.1 %
Lifetime performance calculated up to year
2023
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
2021
6208.890
1014
5910
96.4
98.6
98.6
98.8
98.8
2022
6240.360
1017
6540
74.7
70.3
80.8
70.0
80.6
2023
6136.800
1017
6570
75.0
71.7
77.2
68.9
76.1
Performance indicators are calculated from the Commercial Operation Date.
Above data generated by the PRIS database. Last update on 2024-09-18