KANUPP-2 (K-2)

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
ACP-1000
PAKISTAN ATOMIC ENERGY COMMISSION
PAKISTAN ATOMIC ENERGY COMMISSION
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1017 MWe
1017 MWe
1100 MWe
3060 MWt
Construction Start Date First Criticality Date
20 Aug, 2015
28 Feb, 2021
First Grid Connection Commercial Operation Date
18 Mar, 2021
21 May, 2021

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
18.59 TW.h
77.2 %
79.7 %
22.8 %
76.1 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2021 6208.890 1014 5910 96.4 98.6 98.6 98.8 98.8
2022 6240.360 1017 6540 74.7 70.3 80.8 70.0 80.6
2023 6136.800 1017 6570 75.0 71.7 77.2 68.9 76.1
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-09-18