BARAKAH-3

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
APR-1400
Emirates Nuclear Energy Corporation
Nawah Energy Company
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1337 MWe
1310 MWe
1417 MWe
3983 MWt
Construction Start Date First Criticality Date
24 Sep, 2014
22 Sep, 2022
First Grid Connection Commercial Operation Date
08 Oct, 2022
24 Feb, 2023

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
21.72 TW.h
90.5 %
91.7 %
9.5 %
91.2 %
Lifetime performance calculated up to year 2024

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2022 1189.530 1337 1703
2023 10442.830 1337 7865 97.7 96.8 96.8 97.7 97.7
2024 10083.680 1337 7611 86.6 85.2 90.5 85.9 91.2
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2026-01-17


Previous  (BARAKAH-2) (BARAKAH-4)  Next