BARAKAH-2

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
APR-1400
Emirates Nuclear Energy Corporation
Nawah Energy Company
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1337 MWe
1310 MWe
1417 MWe
3983 MWt
Construction Start Date First Criticality Date
15 Apr, 2013
27 Aug, 2021
First Grid Connection Commercial Operation Date
14 Sep, 2021
24 Mar, 2022

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
11.11 TW.h
NC
NC
NC
NC
Lifetime performance calculated up to year 2022

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2021 1200.190 1345 1891
2022 9914.130 1337 7723
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS


Above data generated by the PRIS database. Last update on 2023-12-02