Skip to content
Skip to navigation
Contact Us
IAEA.org
NUCLEUS
World Statistics
Country Statistics
Publications
Glossary
About PRIS
BARAKAH-2
Operational
Reactor Details
Reactor Type
Model
Owner
Operator
PWR
APR-1400
Emirates Nuclear Energy Corporation
Nawah Energy Company
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
1337
MW
e
1310
MW
e
1417
MW
e
3983
MW
t
Construction Start Date
First Criticality Date
15 Apr, 2013
27 Aug, 2021
First Grid Connection
Commercial Operation Date
14 Sep, 2021
24 Mar, 2022
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
11.11 TW.h
NC
NC
NC
NC
Lifetime performance calculated up to year
2022
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
2021
1200.190
1345
1891
2022
9914.130
1337
7723
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS
Above data generated by the PRIS database. Last update on 2023-12-02
Previous
(BARAKAH-1)
(BARAKAH-3)
Next
UNITED ARAB EMIRATES
BARAKAH-1
BARAKAH-2
BARAKAH-3
BARAKAH-4