BARAKAH-1

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
APR-1400
Emirates Nuclear Energy Corporation
Nawah Energy Company
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1337 MWe
1310 MWe
1417 MWe
3983 MWt
Construction Start Date First Criticality Date
19 Jul, 2012
31 Jul, 2020
First Grid Connection Commercial Operation Date
19 Aug, 2020
01 Apr, 2021

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
29.17 TW.h
81.1 %
83.9 %
18.9 %
81.4 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2020 1561.810 1345 2645
2021 8926.090 1417 6763 91.8 85.4 85.4 85.5 85.5
2022 8196.790 1337 6269 71.6 69.9 76.8 70.0 76.9
2023 10488.130 1337 7906 90.2 88.9 81.1 89.6 81.4
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2025-02-15