CHASNUPP-4 (Chashma Nuclear Power Plant Unit 4)

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
CNP-300
PAKISTAN ATOMIC ENERGY COMMISSION
PAKISTAN ATOMIC ENERGY COMMISSION
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
313 MWe
313 MWe
340 MWe
999 MWt
Construction Start Date First Criticality Date
18 Dec, 2011
15 Mar, 2017
First Grid Connection Commercial Operation Date
25 Jun, 2017
19 Sep, 2017

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
12.52 TW.h
90.2 %
89.2 %
9.8 %
86.1 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2017 484.170 313 1946 38.1 95.2 95.2 35.0 35.0
2018 2557.080 313 8452 96.5 95.7 95.6 93.3 81.5
2019 2181.000 313 7237 82.6 81.5 89.4 79.5 80.6
2020 2474.850 313 8068 91.8 90.8 89.8 90.0 83.5
2021 2165.430 313 7407 84.6 84.3 88.5 79.0 82.5
2022 2654.750 313 8673 99.0 97.1 90.1 96.8 85.2
2023 2492.140 313 8213 93.8 90.4 90.2 90.9 86.1
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-09-18