Reactor Type Model Owner Operator
PWR
CNP-300
PAKISTAN ATOMIC ENERGY COMMISSION
PAKISTAN ATOMIC ENERGY COMMISSION
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
313 MWe
313 MWe
340 MWe
999 MWt
Construction Start Date First Criticality Date
18 Dec, 2011
15 Mar, 2017
First Grid Connection Commercial Operation Date
01 Jul, 2017
19 Sep, 2017

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
5.22 TW.h
89.4 %
83.8 %
10.6 %
80.6 %
Lifetime performance calculated up to year 2019

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2017 484.170 313 1946 38.1 95.2 95.2 35.0 35.0
2018 2557.080 313 8452 96.5 95.7 95.6 93.3 81.5
2019 2181.000 313 7237 82.6 81.5 89.4 79.5 80.6
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2020-07-03