CHASNUPP-4
(Chashma Nuclear Power Plant Unit 4)
Operational
Reactor Details
Reactor Type
Model
Owner
Operator
PWR
CNP-300
PAKISTAN ATOMIC ENERGY COMMISSION
PAKISTAN ATOMIC ENERGY COMMISSION
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
313
MW
e
313
MW
e
340
MW
e
999
MW
t
Construction Start Date
First Criticality Date
18 Dec, 2011
15 Mar, 2017
First Grid Connection
Commercial Operation Date
25 Jun, 2017
19 Sep, 2017
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
12.52 TW.h
90.2 %
89.2 %
9.8 %
86.1 %
Lifetime performance calculated up to year
2023
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
2017
484.170
313
1946
38.1
95.2
95.2
35.0
35.0
2018
2557.080
313
8452
96.5
95.7
95.6
93.3
81.5
2019
2181.000
313
7237
82.6
81.5
89.4
79.5
80.6
2020
2474.850
313
8068
91.8
90.8
89.8
90.0
83.5
2021
2165.430
313
7407
84.6
84.3
88.5
79.0
82.5
2022
2654.750
313
8673
99.0
97.1
90.1
96.8
85.2
2023
2492.140
313
8213
93.8
90.4
90.2
90.9
86.1
Performance indicators are calculated from the Commercial Operation Date.
Above data generated by the PRIS database. Last update on 2024-09-18