CHASNUPP-3
( Chashma Nuclear Power Plant Unit 3)
Operational
Reactor Details
Reactor Type
Model
Owner
Operator
PWR
CNP-300
PAKISTAN ATOMIC ENERGY COMMISSION
PAKISTAN ATOMIC ENERGY COMMISSION
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
315
MW
e
315
MW
e
340
MW
e
999
MW
t
Construction Start Date
First Criticality Date
28 May, 2011
01 Aug, 2016
First Grid Connection
Commercial Operation Date
15 Oct, 2016
06 Dec, 2016
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
14.67 TW.h
88.2 %
89.9 %
11.8 %
85.7 %
Lifetime performance calculated up to year
2023
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
2016
344.980
315
1436
2017
2542.080
315
8256
94.2
93.5
94.0
92.1
92.6
2018
2145.220
315
7152
81.6
80.4
87.5
77.7
85.5
2019
2247.570
315
7508
85.7
85.3
86.8
81.4
84.2
2020
2444.190
315
7931
90.3
89.2
87.3
88.3
85.2
2021
2513.450
315
8649
98.7
99.0
89.6
91.1
86.3
2022
2426.790
315
8071
92.1
89.0
89.5
88.0
86.6
2023
2214.140
315
7487
85.5
80.1
88.2
80.2
85.7
Performance indicators are calculated from the Commercial Operation Date.
Above data generated by the PRIS database. Last update on 2024-09-18