VOGTLE-3

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
AP-1000
GEORGIA POWER CO.
Southern Nuclear Operating Company, Inc.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1117 MWe
1117 MWe
1250 MWe
3400 MWt
Construction Start Date First Criticality Date
02 Mar, 2013
01 Mar, 2023
First Grid Connection Commercial Operation Date
31 Mar, 2023
31 Jul, 2023

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
7.37 TW.h
100.0 %
100.0 %
0.0 %
99.3 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2023 7369.670 1117 6625 100.0 100.0 100.0 99.3 99.3
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-12-04