GUNDREMMINGEN-A (KRB A)
Permanent Shutdown
Reactor Details
Reactor Type
|
Model
|
Owner
|
Operator
|
BWR
|
|
|
KERNKRAFTWERKE GUNDREMMINGEN BETRIEBSGESELLSCHAFT MBH
|
Reference Unit Power (Net Capacity)
|
Design Net Capacity
|
Gross Capacity
|
Thermal Capacity
|
237
MWe
|
237
MWe
|
250
MWe
|
801
MWt
|
Construction Start Date
|
First Criticality Date
|
|
|
12 Dec, 1962
|
14 Aug, 1966
|
|
|
First Grid Connection
|
Commercial Operation Date
|
|
|
01 Dec, 1966
|
12 Apr, 1967
|
|
|
Permanent Shutdown Date
|
13 Jan, 1977
|
LifeTime Performance
Electricity Supplied
|
Energy Availability Factor
|
Operation Factor
|
Energy Unavailability Factor
|
Load Factor
|
13.79 TW.h
|
80.1 %
|
81.2 %
|
19.9 %
|
80.6 %
|
Lifetime performance calculated up to year
1977
Operating History
Year
|
Electricity Supplied
[GW.h]
|
Reference Unit Power
[MW]
|
Annual Time On Line
[h]
|
Operation Factor
[%]
|
Energy Availability Factor
[%]
|
Load Factor
[%]
|
Annual
|
Cumulative
|
Annual
|
Cumulative
|
1966
|
Data from a trial operation not provided
|
1967
|
Data Not Provided
|
1968
|
"
|
1969
|
"
|
1970
|
"
|
1971
|
1991.000
|
250
|
7897
|
90.2
|
89.7
|
NC
|
90.9
|
NC
|
1972
|
1820.300
|
250
|
7260
|
82.6
|
82.0
|
NC
|
82.9
|
NC
|
1973
|
1634.200
|
240
|
6942
|
79.2
|
78.8
|
NC
|
77.7
|
NC
|
1974
|
1818.500
|
240
|
7715
|
88.1
|
86.4
|
84.2
|
86.5
|
84.6
|
1975
|
1797.500
|
237
|
7737
|
88.3
|
85.3
|
84.5
|
86.6
|
85.0
|
1976
|
1211.400
|
237
|
5146
|
58.6
|
57.6
|
80.1
|
58.2
|
80.6
|
1977
|
73.700
|
237
|
309
|
0
|
0
|
80.1
|
0
|
80.6
|
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS
Above data generated by the PRIS database. Last update on 2023-09-27