GROHNDE
(KWG)
Permanent Shutdown
Reactor Details
Reactor Type
Model
Owner
Operator
PWR
PWR
1. (83,3%) PreussenElektra GmbH 2. (16,7%) Stadtwerke Bielefeld
PreussenElektra GmbH
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
1360
MW
e
1289
MW
e
1430
MW
e
3900
MW
t
Construction Start Date
First Criticality Date
01 Jun, 1976
01 Sep, 1984
First Grid Connection
Commercial Operation Date
05 Sep, 1984
01 Feb, 1985
Permanent Shutdown Date
31 Dec, 2021
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
386.84 TW.h
90.3 %
91.6 %
9.7 %
88.4 %
Lifetime performance calculated up to year
2021
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
1984
1214.000
1290
1424
1985
10871.050
1300
8406
95.6
95.2
95.2
95.0
95.0
1986
10205.370
1300
8120
92.7
89.7
92.3
89.6
92.2
1987
9648.480
1300
7979
91.1
86.4
90.3
84.7
89.6
1988
10208.280
1300
8104
92.3
90.8
90.4
89.4
89.6
1989
10279.440
1300
8058
92.0
90.3
90.4
90.3
89.7
1990
10123.560
1325
7872
89.9
88.1
90.0
87.9
89.4
1991
9957.760
1325
7603
86.8
86.4
89.5
85.8
88.9
1992
10424.290
1325
7981
90.9
90.0
89.6
89.6
89.0
1993
10680.110
1325
8147
93.0
92.8
89.9
92.0
89.3
1994
10266.460
1325
8063
92.0
91.9
90.1
88.4
89.2
1995
10771.160
1360
7986
91.2
91.1
90.2
91.1
89.4
1996
10589.850
1360
7861
89.5
88.9
90.1
88.6
89.3
1997
11864.650
1360
8760
100.0
100.0
90.9
99.6
90.2
1998
11146.310
1360
8301
94.8
94.5
91.2
93.6
90.4
1999
11212.150
1360
8351
95.3
95.3
91.4
94.1
90.6
2000
11055.880
1360
8250
93.9
93.7
91.6
92.6
90.8
2001
10926.650
1360
8310
94.9
94.2
91.7
91.7
90.8
2002
10791.890
1360
8233
94.0
93.8
91.9
90.6
90.8
2003
10933.040
1360
8343
95.2
95.0
92.0
91.8
90.9
2004
10695.420
1360
8245
93.9
93.6
92.1
89.5
90.8
2005
10840.950
1360
8364
95.5
94.5
92.2
91.0
90.8
2006
10995.690
1360
8296
94.7
94.2
92.3
92.3
90.9
2007
10818.400
1360
8270
94.4
93.6
92.4
90.8
90.9
2008
10545.950
1360
8048
91.6
91.0
92.3
88.3
90.8
2009
10867.470
1360
8288
94.6
92.0
92.3
91.2
90.8
2010
10782.440
1360
8267
94.4
92.0
92.3
90.5
90.8
2011
9603.190
1360
7341
83.8
81.9
91.9
80.6
90.4
2012
11008.610
1360
8374
95.3
94.9
92.0
92.2
90.4
2013
10420.060
1360
7847
89.6
89.4
91.9
87.5
90.4
2014
9481.180
1360
7326
83.6
83.0
91.6
79.6
90.0
2015
9864.560
1360
7792
89.0
86.3
91.4
82.8
89.8
2016
8415.910
1360
6597
75.1
72.0
90.8
70.4
89.1
2017
9133.020
1360
7540
86.1
78.7
90.4
76.7
88.8
2018
10339.240
1360
8131
92.8
91.6
90.5
86.8
88.7
2019
10113.330
1360
7889
90.1
87.6
90.4
84.9
88.6
2020
9909.600
1360
7774
88.5
85.9
90.3
83.0
88.4
2021
10492.410
1360
8121
92.7
90.4
90.3
88.1
88.4
Performance indicators are calculated from the Commercial Operation Date.
Above data generated by the PRIS database. Last update on 2024-10-03
Previous
(GREIFSWALD-5)
(GUNDREMMINGEN-A)
Next
GERMANY
AVR JUELICH
BIBLIS-A
BIBLIS-B
BROKDORF
BRUNSBUETTEL
EMSLAND
GRAFENRHEINFELD
GREIFSWALD-1
GREIFSWALD-2
GREIFSWALD-3
GREIFSWALD-4
GREIFSWALD-5
GROHNDE
GUNDREMMINGEN-A
GUNDREMMINGEN-B
GUNDREMMINGEN-C
HDR GROSSWELZHEIM
ISAR-1
ISAR-2
KNK II
KRUEMMEL
LINGEN
MUELHEIM-KAERLICH
MZFR
NECKARWESTHEIM-1
NECKARWESTHEIM-2
NIEDERAICHBACH
OBRIGHEIM
PHILIPPSBURG-1
PHILIPPSBURG-2
RHEINSBERG
STADE
THTR-300
UNTERWESER
VAK KAHL
WUERGASSEN