ARMENIAN-1

Permanent Shutdown


Reactor Details

Reactor Type Model Owner Operator
PWR
VVER V-270
Ministry of Energy and Natural Resources of RA
Closed Joint Stock Company Armenian NPP
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
376 MWe
376 MWe
408 MWe
1375 MWt
Construction Start Date First Criticality Date
01 Jul, 1969
15 Dec, 1976
First Grid Connection Commercial Operation Date
22 Dec, 1976
06 Oct, 1977
Permanent Shutdown Date
25 Feb, 1989

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
25.27 TW.h
NC
NC
NC
NC
Lifetime performance calculated up to year 1989

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1976 Data from a trial operation not provided
1977 Data Not Provided
1978 "
1979 "
1980 "
1981 "
1982 "
1983 "
1984 "
1985 "
1986 "
1987 2101.320 408 5600 63.9 59.8 NC 58.8 NC
1988 2149.510 376 5915 67.3 65.5 NC 65.1 NC
1989 505.330 376 1330 93.9 99.5 NC 94.9 NC
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS


Above data generated by the PRIS database. Last update on 2020-07-03

Previous  (ARMENIAN-2) (ARMENIAN-2)  Next