Belgium
Summary
IN OPERATION
MW(e) TOTAL NET CAPACITY
NUCLEAR POWER REACTORS
|
UNDER CONSTRUCTION
MW(e) TOTAL NET CAPACITY
NUCLEAR POWER REACTORS
|
PERMANENT SHUTDOWN
MW(e) TOTAL NET CAPACITY
NUCLEAR POWER REACTORS
|
|
|
ELECTRICITY PRODUCTION SHARE IN 2023
31 320 GWh ELECTRICITY SUPPLIED
Reactors
Name
|
Type
|
Status
|
Location
|
Reference Unit Power
[MW]
|
Gross Electrical Capacity
[MW]
|
First Grid Connection
|
BR-3
|
PWR
|
Permanent Shutdown
|
MOL
|
10
|
12
|
1962-10-10
|
DOEL-1
|
PWR
|
Operational
|
DOEL-BEVEREN
|
445
|
454
|
1974-08-28
|
DOEL-2
|
PWR
|
Operational
|
DOEL-BEVEREN
|
445
|
454
|
1975-08-21
|
DOEL-3
|
PWR
|
Permanent Shutdown
|
DOEL-BEVEREN
|
1006
|
1056
|
1982-06-23
|
DOEL-4
|
PWR
|
Operational
|
DOEL-BEVEREN
|
1026
|
1090
|
1985-04-08
|
TIHANGE-1
|
PWR
|
Operational
|
TIHANGE
|
962
|
1009
|
1975-03-07
|
TIHANGE-2
|
PWR
|
Permanent Shutdown
|
TIHANGE
|
1008
|
1055
|
1982-10-13
|
TIHANGE-3
|
PWR
|
Operational
|
TIHANGE
|
1030
|
1089
|
1985-06-15
|
Above data generated by the PRIS database. Last update on 2024-09-10